We are happy to announce that we have bagged and completed a Power system study project for 110KV/33KV ; 27.5MVA Solar Power Plant in Tamilnadu using ETAP software.The scope of the project is to perform 1. Short circuit ...
We are happy to announce that we have bagged a project to perform power system studies for a Microgrid from an original equipment manufacturer of Battery Energy Storage SystemThe Microgrid green hydrogen plant produces hydrogen through electrolysis of water ...
We are happy to announce we have bagged a power system study for the “3.00 MTPA PASTE FILL PLANT FOR BACK FILLING MALANJKHAND UNDERGROUND MINE – Hindustan Copper Limited”The Hindustan copper Plans to built the Paste fill plant at ...
We are thrilled to announce that we have bagged a project for conducting the Power System study for the Numaligarh Refinery Expansion Project (NREP) in Assam, India.There is an increase in the capacity of the refinery from ...