Arc flash isnโ€™t just a compliance checkboxโ€”itโ€™s a matter of life and safety.
Weโ€™re proud to support Trinity Touch Pvt Ltd in performing a detailed ๐——๐—–ย ๐—ฎ๐—ฟ๐—ฐย ๐—ณ๐—น๐—ฎ๐˜€๐—ตย ๐˜€๐˜๐˜‚๐—ฑ๐˜†ย for the ๐Ÿฏ๐Ÿฌ.๐Ÿดย ๐— ๐—ช๐—ฝย / ๐Ÿฎ๐Ÿฐย ๐— ๐—ช๐—ฎ๐—ฐย ๐—ง๐˜„๐—ถ๐—ปย ๐—ฅ๐—ถ๐˜ƒ๐—ฒ๐—ฟย ๐—ฆ๐—ผ๐—น๐—ฎ๐—ฟย ๐—™๐—ฎ๐—ฟ๐—บ, located in ๐—ก๐—ฒ๐˜„ย ๐—ญ๐—ฒ๐—ฎ๐—น๐—ฎ๐—ป๐—ฑ, ๐˜‚๐˜€๐—ถ๐—ป๐—ดย ๐—˜๐—ง๐—”๐—ฃ.
This study focused on analyzing and labeling over ๐Ÿญ๐Ÿญ๐Ÿฐย ๐—ฆ๐˜๐—ฟ๐—ถ๐—ป๐—ดย ๐—–๐—ผ๐—บ๐—ฏ๐—ถ๐—ป๐—ฒ๐—ฟย ๐—•๐—ผ๐˜…๐—ฒ๐˜€ย (๐—ฆ๐—–๐—•๐˜€) ๐—ฎ๐—ป๐—ฑย ๐—ฆ๐—ฃ๐—ฆย ๐—ฝ๐—ฎ๐—ป๐—ฒ๐—น๐˜€ย to comply with ๐—ก๐—™๐—ฃ๐—”ย ๐Ÿณ๐Ÿฌ๐—˜:๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐย and ensure safety for frontline technicians.

๐—ฆ๐—ฐ๐—ผ๐—ฝ๐—ฒย ๐—ผ๐—ณย ๐—ฆ๐˜๐˜‚๐—ฑ๐˜†
โ€ข Modeled the entire PV DC system including strings, SCBs, and SPS.
โ€ข Used the Paukert method to compute incident energy levels and arc flash boundaries.
โ€ข Defined arc flash categories and recommended PPE levels for each panel.
โ€ข Generated hazard labels and boundary distances for all DC panels.
โ€ข Simulated worst-case fault conditions under irradiance of 1000 W/mยฒ and temperature of 50ยฐC.

๐—–๐—ต๐—ฎ๐—น๐—น๐—ฒ๐—ป๐—ด๐—ฒ๐˜€ย ๐—™๐—ฎ๐—ฐ๐—ฒ๐—ฑ
โ€ข High panel count (114+), each requiring individual fault analysis.
โ€ข Incident energy up to 8.9 cal/cmยฒ observed at SPS bus panels.
โ€ข Non-uniform arc flash hazard levels across panels, complicating O&M strategy.
โ€ข Accurate modeling of fuse behavior and worst-case fault clearing time.
โ€ข Ensuring compliance with international arc flash safety standards (NFPA 70E, IEEE 1584).

๐—ฅ๐—ฒ๐—ฐ๐—ผ๐—บ๐—บ๐—ฒ๐—ป๐—ฑ๐—ฎ๐˜๐—ถ๐—ผ๐—ป๐˜€
โ€ข Apply arc flash labels with hazard boundary information on all SCBs and SPS panels.
โ€ข Enforce PPE Level 1 for SCBs and PPE Level 3 for SPS panels.
โ€ข Implement remote isolation and proper lock-out/tag-out (LOTO) procedures.
โ€ข Conduct periodic arc flash reviews and NFPA 70E safety training for technicians.

This project reinforces the importance of arc flash risk studiesโ€”especially in high-density PV systems where fault energy can vary dramatically from one panel to another.

๐—”๐—ฟ๐—ฐ ๐—™๐—น๐—ฎ๐˜€๐—ต ๐—ฅ๐—ถ๐˜€๐—ธ