The scope of the project is to perform
1. Short circuit studies
2. Relay coordination &
3. Unit protection for Transmission lines and Transformers
4. Arc flash studies
The Plant Consists Of
• 110 kV Transmission line incomer.
• 1nos 110/33kV 22/27.5MVA Power Transformers and 3nos of 33/0.69kV 9MVA IDT transformer
In Relay coordination the current and time discrimination for the network is given based on the sequence of the operation from downstream to upstream. In unit protection it is ensured that the transmission line and transformer are protected for the internal faults.
Unit protection and relay coordination study are crucial for ensuring reliable and safe operation of electrical power systems.
It leads to
• enhanced system reliability,
• increased equipment lifespan,
• improved safety,
• compliance with industry standards,
• cost-effective system operation.
Investing in a comprehensive unit protection and relay coordination study can have significant long-term benefits for the power system.
Congratulations to Selvakumar S and Ajithkumar Gunasekaran for bagging the project, Congratulations to Jeyakumar and Suriya Kumar for execution of the project.
No comment