The scope of the project is to perform
- Load flow study in ETAP
- Short Circuit study in ETAP
- Cable Energization in PSCAD
- Transformer Energization Study in PSCAD with various options below
- Soft energisation of transformers and identifying optimal Ramp up of Diesel generators
- Point on Wave Switching
- Pre-Magnetizing Transformer
Main theme behind the project is reduce the carbon emission and minimise the running cost of various industries and commercial building. Chakr innovation brought a novel idea of effectively utilising the Diesel generators in near by industries and Commercial building during grid failure / Power curtailment. PowerProjects helping Chakr to optimally design their infrastructure to make their proposal technically feasible while optimising the cost. If the projects comes to reality which will reduce 20% of carbon emission and 16% of cost saving.
Congratulations to Selvakumar and Ajith G for bagging the project and congratulations to Sivakumar and Kishore for executing it.