Across the world POWER PROJECTS has successfully completed 350+ projects in power system studies.
SECTORS
OIL AND GAS
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
Indian Navy |
Vizag |
Short Circuit Studies Relay Coordination |
Mak Controls |
Voltech |
Offshore |
ETAP 14 |
ABB Bangalore |
India |
Transient Stability Studies User Defined Model Development for AVR, Governor Unit Protection Insulation Coordination |
Dangote |
EIL |
Oil & Gas |
ETAP PSCAD |
KURDISTAN PIPELINE COMPANY PTE LTD. |
IRAQ |
Protection co-ordination |
KPC |
Exidasp |
Oil & Gas |
ETAP |
40 Feeder Project |
Saudi Arabia |
Short Circuit Study & Protection co-ordination |
Synergy |
Synergy |
Oil & Gas |
ETAP |
South Ahamdi – Construction of New House |
Kuwait |
Short Circuit Study & Protection co-ordination |
KOC |
HEISCO |
Oil & Gas |
ETAP |
KURDISTAN PIPELINE COMPANY PTE LTD |
Iraq |
Load flow, Short circuit, Motor acceleration study, Harmonic Analysis, RAM study & Transient Overvoltage Study |
KPC |
EXIDASP |
Oil & Gas |
ETAP |
11 kV Switchgear Modification |
Qatar |
Load flow, Short circuit and Relay co-ordination |
Winstar Electromechanical Qatar |
WINSTAR |
Oil & Gas |
ETAP |
AL-Shabbagh |
Oman |
Short circuit & Harmonics analysis |
AL-Shabbagh |
AL-Shabbagh |
Oil & Gas |
ETAP |
400V DG Load Sharing and Load shedding |
UAE |
Load flow, Short Circuit, Motor starting, Harmonics, Transient Stability |
GKPI |
Exidasp |
Oil & Gas |
ETAP |
GAIL Petrotec Complex |
Auraiya,Uttat Pradesh |
Relay Coordination, Unit Protection |
GAIL |
TCE |
Petrochemicals and Refining |
ETAP 20.5 |
Supergas |
Tuticorin |
Short circuit and Realy co-ordination |
SHV Energy |
SHV Energy |
Oil & Gas |
ETAP 20.5 |
Integration of WTG & BESS with FPSO |
Brazil |
LF,SC,TS, BESS |
BW offshore |
ABB SG |
Offshore |
ETAP / DigSILENT |
Feasibility Study for Back up power for DGS N |
Iraq |
Engineering services |
ZPOD |
KSS energy consultants / ARD |
Oil & Gas |
N/A |
Qatar Gas |
Qatar |
Short circuit and Relay Coordination |
Qatar Gas Operating Company Ltd. |
Winstar LLC |
Oil & Gas |
ETAP |
220/33kV IOCL Refinery |
Gujarat |
Insulation Co-ordination, Load flow, Short Circuit, Harmonic Analysis,Relay Cordination Report |
IOCL |
Siemens |
Oil and Gas |
PSCAD & ETAP |
Doosan Bobcat Private Ltd |
Chennai |
DG upgrade Feasiblity and HT cable routing |
Doosan Bobcat |
Power Projects |
Oil & Gas |
N/A |
Expansion of Existing 5MMTPA Capacity to 10MMTPA Capacity of Ennore LNG |
Ennore |
Load Flow, Short Circuit, Motor Starting |
IOLPL |
RINA |
Oil & Gas |
ETAP |
Zubair oil field |
Iraq |
Load Flow, Short Circuit, Motor Starting, Relay coordination |
ZPOD |
KSS energy consultants / ARD |
Oil & Gas |
ETAP |
Battery Energy Storage System Rating – Power System Study – BESS and Wind Turbine Generator for Electrification of Brage Platform |
ABB |
Offshore |
Homerpro |
|||
Replacement of 33kV Underground cables in DGS-N to H Area |
Iraq |
Cable Replacment Engineering works |
ZPOD |
KSS energy consultants / ARD |
Oil & Gas |
ETAP |
11kV 2.7MVA Garmian Block |
Kurdistan |
Load Flow, Short circuit, Relay coordination, |
Ministry of Iraq |
Exisdasp |
Oil & Gas |
ETAP |
Back up Power Supply to DGS N – Supply of containerized substation for SS-01 & 02 |
Iraq |
Package Substation Engineering for LLI items |
ZPOD |
KSS energy consultants |
Oil and Gas |
AutoCAD,ETAP |
Quest ETAP Consultant Services |
Banaglore,India |
ETAP Consultant services |
– |
Quest Global |
Oil and Gas |
ETAP |
Cable interconnection diagram |
Dubai |
Cable interconnection diagram |
ADNOC |
– |
Oil and Gas |
ETAP |
ZUBAIR DGS – Electrical LV Load Separation |
Iraq |
Engineering service for new package substation |
ZPOD |
KSS energy consultants |
Oil and Gas |
AutoCAD,ETAP |
DGS-N all 33kV, 11kV, 6kV & 0.4kV Switchgears |
Iraq |
Load Flow, Short Circuit, Motor Starting Harmonic Study Relay coordiantion, |
ZPOD |
KSS energy consultants |
Oil and Gas |
ETAP |
ZUBAIR DGS – Provision of Ventilation Systems in DGS-N |
Iraq |
Enginering Services |
ZPOD |
KSS energy consultants |
Oil and Gas |
ETAP |
Training on Power System Studies using ETAP |
India |
ETAP Training |
Toyo Engineering |
Toyo Engineering |
Oil and Gas |
ETAP |
20BMA01 Switchgear (18nos of feeder) |
Qatar |
RC |
Soofi |
soofi |
Oil and Gas |
ETAP |
RENEWABLES
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
BESS Optimization for 5 MW Solar Plant by using Homer Pro |
Chennai |
BESS Sizing |
AVANT GRADE |
AVANT GRADE |
Renewables |
Homerpro |
2 |
Annual Energy Yield Assessment of the Grid Connected Solar Plant |
Oman |
PV SYST |
HES |
HES |
Renewables |
PV syst |
3 |
220MW Solar Plant & BESS |
USA |
Feasible |
Avant Garde |
Avant Garde |
Renewables |
PVSYST/Homer |
4 |
Root Cause analysis for 800.215MWp Al Kharsaa Solar power |
Qatar |
Root cause analysis for power dip for the solar palnt |
Siraj 1 |
Power China |
Renewables |
ETAP 20 PSCAD |
5 |
Training on Protection Relays |
Jaisalmer |
Training on Protection Relays |
Renew Power |
Renew Power |
Renewables |
ETAP |
6 |
Garvagh 38kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Wind |
PSCAD EMTP-RV |
7 |
Carickallen 38kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Wind |
PSCAD EMTP-RV |
8 |
Magheramore 38kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Wind |
PSCAD EMTP-RV |
9 |
ESB & ESK 110/38kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Wind |
PSCAD EMTP-RV |
10 |
300 MW Terraform Windfarm |
Maharastra, India |
Safety Audit |
Terraform |
Substation Engineers |
Wind |
N/A |
11 |
M120 – 2 MW Full Converter (Type 4) Wind Turbine Generator Product Certification |
India |
Load Flow studies Short Circuit Studies LVRT Studies |
Senvion |
Senvion |
Wind |
DigSILENT |
12 |
M120 – 2 MW Full Converter (Type 4) Wind Turbine Generator Product Certification |
India |
Flicker Analysis Power Factor Requirement Studies Harmonic Analysis |
Senvion |
Senvion |
Wind |
DigSILENT |
13 |
220/35kV 100MW Nukus Wind Power Plant |
Uzbekistan |
CT/VT Calculation |
Uzassystem |
Uzassystem |
Wind |
Excel |
14 |
Secondary Design Engineering for 100MW WindPlant |
Uzbekistan |
DE |
Nukus |
Uzasystem |
Wind |
– |
15 |
1 MW Solar Power Plant |
Erulapatti, India |
Pre feasibility Study |
RK Energy |
– |
Solar |
PVSYST |
16 |
50 MWp in Dummakhedi Solar Power Plant ( SITARA – 30 MWp L’Volta – 20 MWp) |
Madhya Pradesh, India |
Safety Audit |
Terraform |
Substation Engineers |
Solar |
N/A |
17 |
Terraform 100MW Solar Power Plant |
Madhya Pradesh, India |
Safety Audit |
Terraform |
Substation Engineers |
Solar |
N/A |
18 |
1500 MW Al Dibdida Solar Power Plant |
Kuwait |
Load Flow studies Short Circuit Studies Harmonic Analysis |
L&T ECC |
L&T ECC |
Solar |
ETAP 19 DigSILENT |
19 |
30MW Solar Power plant along with 132kV/33kV substation |
Malaysia |
Short Circuit Studies, Relay Coordination, Unit Protection |
VELLD |
VELLD |
Solar |
ETAP 19.5 |
20 |
51 MW PV Solar Power Plant |
Madhya Padesh, India |
Power factor Correction and Power Quality study |
Renew Power |
– |
Solar |
ETAP 20.0 |
21 |
132kV Substation |
Malaysia |
Relay Coordination, Unit Protection |
VELLD |
VELLD |
Solar |
ETAP 20.0 |
22 |
30MW Kedah Solar Power Plant |
Malaysisa |
Short Circuit Study & Protection co-ordination |
VELLD |
VELLD |
Solar |
ETAP |
23 |
300MW Solar Power Plant |
Rajasthan |
Harmonic Resonance study |
SB Energy |
SB Energy |
Solar |
PSCAD |
24 |
25MW Solar Power Plant |
Dibibouti |
optimization of pv and battery |
Avant Garde |
Avant Garde |
Solar |
Homer pro |
25 |
5 MW Solar Power Plant |
New York,USA |
Load flow, Short circuit, Motor Starting, Relay co-ordination, Arc flash |
MG CONSULTANT |
MG CONSULTANT |
Solar |
N/A |
26 |
300 MW Rabigh Solar Power Plant |
Saudi Arabia |
Review Engineering |
Saudi Electric Company |
China enegy Engineering Coorporation |
Solar |
N/A |
27 |
2 MW Rooftop Solar Power Plant |
Banglore |
Load Flow, Short Circuit |
HPCL |
Bataan solar |
Solar |
ETAP |
28 |
15 MW Solar Power Plant |
New York,USA |
Load flow Studies – Reactive Power Compensation studies |
MG CONSULTANT |
MG CONSULTANT |
Solar |
ETAP |
29 |
300 MW Solar Power Plant |
Rajasthan |
Load flow, Short circuit and Relay co-ordination |
Renew Power |
GE |
Solar |
ETAP |
30 |
20 MW Solar Power Plant |
Karnataka, India |
Route Cause analysis |
ATRIA |
ATRIA |
Solar |
N/A |
31 |
1500 MW Sudiar Solar Power Plant |
Saudi Arabia |
Relay coordination, Unit Protection, AC & DC Arc flash studies |
L&T ECC |
L&T ECC |
Solar |
ETAP |
32 |
65 MW Solar Power Plant |
India |
Relay coordination, Unit Protection |
REFEX |
ACE |
Solar |
ETAP |
33 |
30MW Solar Power Plant |
USA |
Load flow Short Circuit |
KEENTEL |
KEENTEL |
Solar |
ETAP |
34 |
NEOM – 1650 MW Wind, 2400 MW Solar, 400 MW Battery |
Saudi Arabia |
Reactive Power Compensation, Input Preparation |
Air Products |
L&T ECC |
Solar |
ETAP |
35 |
250 MW Solar Power Plant |
India |
Insulation Coordination, Harmonic measurement, Harmonic analysis |
SPRING Energy |
L&T ECC |
Solar |
ETAP, PSCAD |
36 |
200 MW Solar Power Plant |
Uzbekistan |
Reactive Power Compensation, Input Preparation |
MASDAR |
UZASSYSTEM |
Solar |
ETAP |
37 |
30 MW Solar Power Plant -132 / 33 kV Substation |
Malaysia |
Relay Coordination, Unit Protection |
TNB |
VELLD |
Solar |
ETAP |
38 |
Orb energy Private Ltd |
Karnataka, India |
Relay Coordination, Unit Protection |
Orb energy |
Orb energy |
Solar |
ETAP |
39 |
5MW Solar Power Plant |
USA |
Inverter settings |
MG Consultant |
MG Consultant |
Solar |
N/A |
40 |
27.5MWp Solar Plant |
Karnataka |
LF,SC,RC |
Everrenew |
Everrenew |
Solar |
ETAP |
41 |
Solar Plant Engineering Review |
USA |
Review Engineering |
Keentel |
Keentel |
Solar |
N/A |
42 |
230MW NTPC CPSU Solar Plant |
Tuticorin |
Harmonic Measurement |
NTPC |
L&T |
Solar |
N/A |
43 |
Harmonic Analysis for Solar Plant – Staveley & Basildon |
UK |
Harmonic Analysis |
Midrula |
Midrula |
Solar |
DigSILENT |
44 |
25MW AC Solar Power Plant |
Tamilnadu, India |
Relay Coordination, Unit Protection |
Acerenewtech |
Solar |
ETAP |
|
45 |
SAAD IPP 300MW Solar Power Plant |
Saudi Arabia |
Insulation Coordination Study report (TOV, SFO, FFO) |
Saudi power procurment company/ Al Ghazala Energy Company |
Elesewedy Electric / Suggr Energy |
Solar |
PSCAD |
46 |
Vermilton Rise 185MW Solar Power Plant |
USA |
Load flow. Short circuit, Cable ampacity, Energy loss study |
Axial Energy |
Ace Renewtech |
Solar |
ETAP |
47 |
Apraava Dedasari 250MW Soar Power Plant |
India |
Transformer OLTC Failure |
– |
Param renewables |
Solar |
N/A |
48 |
DNO Steveley solar power Plant, UK |
UK |
P28 Study |
Midrula |
Midrula |
Solar |
DigSILENT |
49 |
800.215MWp Al Kharsaa Solar Power Plant |
Qatar |
Energy Flow & Power Impact studies to analyze the losses and low performance of the Al Kharsaa PV |
Siraj 1 |
Power China |
Solar |
ETAP |
50 |
SPV 50MW Ground Mounted solar Power Plant |
Bjilai,Chatttisgarh |
Relay coordination and validation |
Shresha RoofToop solar PV / Southeast central Railway |
Refex |
Solar |
ETAP |
51 |
100MW (39MW Wind+60MW Solar) Hybrid Power Project |
– |
Line Loss study |
– |
Everrenew |
Solar |
ETAP |
52 |
485MW APZ Zarqa CCGT Power Plant and 50MW AP Risha Solar Plant |
Jordan |
Arc Flash Study |
ACWA |
Khalid |
Solar |
ETAP |
53 |
DNO Braintree Solar Power Plant |
UK |
Harmonic Analysis |
Midrula |
Midrula |
Solar |
DigSILENT |
54 |
DNO Braintree Solar Power Plant |
UK |
P28 Study |
Midrula |
Midrula |
Solar |
DigSILENT |
55 |
DNO Basildon Solar Power Plant |
UK |
P28 Study |
Midrula |
Midrula |
Solar |
DigSILENT |
56 |
Engineering design for 180MW (100MWSolar + 80Wind) Hybrid Power Project |
India |
Short circuit, Relay coordiantion, AC ventililation sizing & Layout Fire Fighting Layout |
Everrenew |
Everrenew |
Solar |
ETAP |
57 |
DNO Braintree Solar Power Plant |
UK |
G99 Study |
Midrula |
Midrula |
Solar |
DigSILENT |
58 |
DNO Basildon Solar Power Plant |
UK |
G99 Study |
Midrula |
Midrula |
Solar |
DigSILENT |
59 |
DNO Staveley Solar Power Plant |
UK |
G99 Study |
Midrula |
Midrula |
Solar |
DigSILENT |
60 |
DNO Alliance Park Solar Power Plant |
UK |
G5/4 |
Midrula |
Midrula |
Solar |
DigSILENT |
61 |
PSCAD simulation Model / For Open Access Kamuthi Project |
India |
Reactive power compensation |
Enerparc Energy Private Limited |
Enerparc Energy Private Limited |
Solar |
PSCAD |
62 |
30MW Braintree, Staveley, Basildon Solar Plant |
UK |
Lightning Risk Assesment |
Midrula |
Midrula |
Solar |
Excel |
63 |
180MW Solar Plant |
India |
Relay Coordination Study |
Adani |
Etricals Engineers Private Limited |
Solar |
ETAP |
64 |
70MW Solar Plant |
UP, India |
Load Flow |
Fourth Partner |
Fourth Partner |
Solar |
ETAP |
65 |
38MW Solar Plant |
Tamilnadu, India |
Root cause analysis |
First Energy |
Everrenew |
Solar |
ETAP |
66 |
230 MW and 240MW Solar Plant |
Uzbekistan |
Relay Coordination |
Uzasystem |
Solar |
DigSILENT |
|
67 |
300MW Solar plant |
Bikaner, India |
Harmonic Measurement and Analysis |
Enel |
Enel |
Solar |
ETAP |
68 |
2 MW Solar Plant |
Maharastra, India |
Short circuit, Relay coordination, Arc Flash |
Total Energy |
Total Energy |
Solar |
ETAP |
69 |
90MW Anta Solar Power Plant |
Rajasthan, India |
LF,SC,RC |
NTPC |
Amararaja |
Solar |
ETAP |
DATA CENTER
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
FRA 54.3 Data Center |
Ireland |
Load Flow Studies Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
H&MV Engineers |
Substation Engineers |
Data Center |
ETAP 14.1 |
2 |
FRA 54.4 Data Center |
Ireland |
Relay Coordination Studies |
H&MV Engineers |
Substation Engineers |
Data Center |
ETAP 14.1 |
3 |
Nxtra Data Center |
Pune |
Load Flow Studies, Short Circuit Studies, Motor Acceleration Studies,, Transient Studies, Harmonic Analysis, Relay Coordination Studies, Arc Flash Studies, Earthing, Transformer Energisation Studies |
Microsoft, STT |
Sterling Wilson |
Data Center |
ETAP 19.5 PSCAD |
4 |
STT Data Center |
Chennai |
Load Flow Studies, Short Circuit Studies, Motor Acceleration Studies,, Transient Studies, Harmonic Analysis, Relay Coordination Studies, Arc Flash Studies, Earthing, Transformer Energisation Studies |
Microsoft, STT |
STT |
Data Center |
ETAP 19.5 PSCAD |
5 |
COLT Data Center |
Mumbai |
Load Flow, Short Circuit, Motor Starting, Harmonic Analysis, Transient Stability, Protection setting calculation in LV & MV, Unit protection, Arc Flash, Reliability Analysis |
COLT |
Sterling Wilson |
Data Center |
ETAP 21 |
6 |
STT Data Center |
India |
Load flow, Short Circuit, Relay coordination, Unit Protection, |
STT Data Center Chennai |
ABM |
Data Center |
ETAP 21 |
8 |
22/0.415kV Data Centre Plant |
Dubai |
Short Circuit, Relay Coordination, Arc Flash |
Mega power |
Mega power |
Data center |
ETAP |
9 |
132/11kV Hemel Data Center |
UK |
Load Flow, Short circuit, Relay coordination, |
Midrula |
Midrula |
Data center |
DigSILENT |
10 |
LHR095H Data Center |
UK |
Load Flow, Short circuit, Relay coordination, |
Midrula |
Midrula |
Data center |
DigSILENT |
11 |
Quantum Switch Data Center |
Qatar |
Load flow. Short circuit, Relay coordiantion, Arc Falsh |
Q DATA / Quantum Switch |
Winstar LLC |
Data center |
ETAP 20.5 |
12 |
Hemel Data Center |
UK |
Transformer Energisation Study |
Midrula |
Midrula |
Data center |
DigSILENT |
13 |
Chandos Data center |
UK |
Load Flow, Short Circuit |
Midrula |
Midrula |
Data center |
DigSILENT |
14 |
Khazna Data Center |
Dubai |
Relay Coordination |
Khazana |
AASA Group |
Data center |
ETAP 21 |
15 |
Honeywell Data Center |
Madurai, India |
Short circuit, Relay coordiantion, Arc Falsh |
Honeywell |
Honeywell,Madurai |
Data center |
ETAP 21 |
16 |
LHR095H Data Centre |
UK |
Harmonic Analysis |
Mirdula |
Mirdula |
Data center |
DigSILENT |
17 |
220kV GIS Data Center |
Mumbai, India |
Insulation Coordination Study |
Power Engineers |
Power Engineers |
Data center |
PSCAD |
SUB STATION& POWER PLANT
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
NFE1 QG Camp |
Qatar |
LF,SC,RC |
Qatar Gas company |
Petrotec |
Substation |
ETAP |
2 |
KSS Wells Electrification |
Iraq |
Load flow, short circuit, Relay coordination |
KSS |
KSS |
Substation |
ETAP |
3 |
DGS N Substation Instrumentation Work |
Iraq |
Fire and gas system |
KSS |
KSS |
Substation |
ETAP |
4 |
132kV GIS Substation |
Iraq |
Pre Bid Engineering Support |
KSS |
KSS |
Substation |
ETAP |
5 |
MOD Fast track project |
Iraq |
Load flow, short circuit, Relay coordination |
KSS |
KSS |
Substation |
ETAP |
6 |
Kemin Industries South Asia Pvt.Ltd |
Chennai, India |
Arc Flash Study |
Kemin |
Kemin |
Substation |
ETAP |
7 |
Detail design of Permanent Power Supply through overhead line (KPS2 TO RETM) and establishment of new substation in RETM |
Kurdistan |
Load flow, short circuit, Relay coordination, Transient Overvoltag |
KPC |
Exidasp |
Substation |
ETAP |
8 |
Cable Ampacity |
Cable Ampacity |
Kestrel |
KESTREL |
Substation |
ETAP |
|
9 |
Training on Detail Engineering |
Hyderabad, India |
DE Training |
Amararaja |
Amararaja |
Substation |
Excel |
10 |
Training on Power Quality using PSCAD |
Bangalore, India |
PSCAD Training |
InPhase Power Technologies Private Limited |
InPhase Power Technologies Private Limited |
Substation |
PSCAD |
11 |
DUBA Combine Cycle Power Plant |
Saudi Arabia |
Arc Flash Studies |
Saudi Electric Company |
ModPro Engineers |
Power Plant |
ETAP 14.1 |
12 |
275kV Transmission Network |
Malaysia |
Short Circuit Studies Relay Coordination Studies |
Uniten |
SHER Engineering |
Power Plant |
DigSILENT |
13 |
2 * 660MW Thermal Power Plant TPCIL |
Nellore, India |
Relay Coordination Studies |
SempCorp |
Nissi Engineering |
Power Plant |
ETAP 14.1 |
14 |
DUBIN Gas Power Plant |
Ireland |
Load Flow Studies Short Cicuit Studies Transient Stability Studies Transformer Energisation Studies Earthing Studies |
H&MV Engineers |
Substation Engineers |
Power Plant |
ETAP 14.1 |
15 |
Mudgal 20 MW Solar Power Plant |
Karnataka, India |
Power Evacuation Study |
SPML |
SPML |
Power Plant |
ETAP 19 |
16 |
10 MW Solar Power Plant |
UP |
Power Evacuation Study |
ATRIA |
ATRIA |
Power Plant |
ETAP 19 |
17 |
50 MW Solar Power Plant |
Hariyana |
Power Evacuation Study |
ATRIA |
ATRIA |
Power Plant |
ETAP 19 |
18 |
Almarai 40 MW Diesel Power plant |
Saudi Arabia |
Relay Coordination |
Pothigai Power Systems |
Power Plant |
ETAP 19.5 |
|
19 |
Ritaj Consultants |
Muscat Oman |
Ritaj Engineers and Consultants |
Ritaj Engineers and Consultants |
Power Plant |
DigSILENT |
|
20 |
2 * 72 MW Waste heat Power Plant |
Singapore |
Load Flow, Short Circuit, Motor Starting, Transient Stability, Relay Coordination, Harmonic Analysis |
ABB Singapore |
ABB Singapore |
Power Plant |
ETAP 20.0 |
21 |
Training on Unit Protection |
Malaysia |
Unit Protection |
TUASPRING PTE LTD |
TUASPRING PTE LTD |
Power Plant |
N/A |
22 |
110/38 kV Rosspile /Gillinstown |
Ireland |
Insulation co-ordination study |
H&MV Engineers |
Substation Engineers |
Power Plant |
PSCAD |
23 |
AL BARAHA Super 1 GIS – 400/220 kV |
Qatar |
Insulation co-ordination study |
L&T ECC |
L&T ECC |
Power Plant |
PSCAD |
24 |
27 MW Cogeneration Plant |
India |
Transient Stability Studies |
GE |
GE |
Power Plant |
ETAP |
25 |
120 MW Thermal Power Plant |
Gummudipoondi |
Transformer Energisation |
Suryadev |
Suryadev |
Power Plant |
PSCAD |
26 |
ADDC |
Abu Dhabi |
Load Flow, Short Circuit, Motor Starting, Harmonic Analysis, Protection setting calculation in LV & MV |
ABU DHABI TRANSMISSION & DESPATCH COMPANY |
DANWAY-ELECTRICAL |
Power Plant |
ETAP |
27 |
Manpower Support for Engineering |
Singapre |
Manpower Support for Engineering |
Nexvision power & Automation |
Nexvision power & Automation |
Power Plant |
N/A |
28 |
Secondary Design and Layout |
Coimbatore |
Detail engineering |
Senvac |
Senvac |
Power Plant |
N/A |
29 |
22 kV Substation and RMU |
Ethiopia |
Short circuit analysis |
IMEX |
IMEX |
Power Plant |
ETAP |
30 |
26 MW Hydro Power Plant |
Vietnam |
Short circuit analysis |
BFL |
BFL |
Power Plant |
ETAP |
31 |
132 / 33 kV Substation |
Malaysia |
Unit protection |
VELLD |
VELLD |
Power Plant |
N/A |
32 |
Training on Short Circuit Study |
Bangalore |
Training on Short Circuit Study |
BFL |
BFL |
Power Plant |
PSCAD |
33 |
Irrigation Pumping Station – 16 MW SRIM |
Andhra Pradesh |
Motor acceleration studies |
– |
Radical power Solutions |
Power Plant |
ETAP |
34 |
110/38 kV Rosspile /Gillinstown |
Ireland |
Insulation co-ordination study |
H&MV Engineers |
H&MV |
Power Plant |
PSCAD |
35 |
Stevin Rock/ Rak Rock Switching station |
Dubai |
Short circuit and Realy co-ordination |
Kestrel |
Kestrel |
Power Plant |
ETAP |
36 |
APOC PDH – UTOS 220 kV GIS Substation |
Saudi Arabia |
Insulation co-ordination |
GE |
Ingenious |
Power Plant |
PSCAD |
37 |
2 * 600 MW Thermal Power Plant |
Anuppur, Madhya Pradesh |
l.oad flow, Short circuit and Motor acceleration studies |
MosearBear |
TCE |
Power Plant |
ETAP |
38 |
Qatar Company for Airports Operation and Management |
Qatar |
RC |
Winstar |
Power Plant |
ETAP 20.5 |
|
39 |
Hamad International Airport – CSN & CSE Expansions |
Qatar |
Unit Protection |
Winstar |
Power Plant |
ETAP 20.5 |
|
40 |
Hamad International Airport – Non Essential and Essential Supply Compact Substation |
Qatar |
RC |
Winstar |
Power Plant |
ETAP 20.5 |
|
41 |
2*32 MW Gas Turbine Power Plant |
Russia |
Transient Stability |
Tashkent HPP |
TCE |
Power Plant |
ETAP 20 |
42 |
220/33kV wind farm pooling substation |
Kachchh Gujarat |
Insulation coordination |
– |
NS Engineers |
Power Plant |
PSCAD |
43 |
FGD of Thermal Power Plant |
India |
Load Flow, Short circuit, Motor starting Relay coordination, |
– |
TCE |
Power Plant |
ETAP |
44 |
FAIR & AQAH Substation |
UAE |
Relay coordination |
– |
KESTREL |
Power Plant |
ETAP |
45 |
OPEN CYCLE GAS TURBINE GENERATING STATION- STAGE 1A |
Singapore |
Insulation Coordination Study for (PSCAD) 400kV GIS ▪ Temporary Over Voltage ▪ Slow Front Overvoltage ▪ Fast Front Overvoltage • Transformer Energization Study • PSS Voltage Regulator Stability Study • Transient Stability Study |
– |
YD |
Power Plant |
PSCAD / ETAP /Matlab |
46 |
220/33kV Reliance Life Science Substation |
India |
Insulation Coordination Study report (TOV, SFO, FFO) |
Reliance |
Siemens |
Power Plant |
PSCAD |
47 |
SHP 33/11kV X-Ray Primary Substation |
UK |
Relay Coordination |
– |
Asa Bhanu |
Power Plant |
DigSILENT |
48 |
Keppel Sakra Cogen 600MW Advanced Gas Turbine Cogeneration Combined Cycle Plant |
Singapore |
Insulation Coordination Study for (PSCAD) 400kV GIS ▪ Temporary Over Voltage ▪ Slow Front Overvoltage ▪ Fast Front Overvoltage • Transformer Energization Study • PSS Voltage Regulator Stability Study • Transient Stability Study |
– |
YD |
Power Plant |
PSCAD / ETAP / Matlab |
49 |
ISRO EHT/HT Power System |
India |
Short circuit, Relay coordiantion, Transformer Protection |
ISRO |
ISRO |
Power Plant |
ETAP |
50 |
250MW Lignite Fired Power Plant |
India |
Arc Flash Study |
TAQA Neyveli Power Company Pvt, Ltd |
TAQA Neyveli Power Company Pvt, Ltd |
Power Plant |
ETAP |
51 |
2*60 & 1*150 MW CEL – I & II Thermal Power Plant |
cambodia |
Lightning, Relay coordination, Earthing, Insulation Coordination |
Combodia Energy Limited |
Leader Energy |
Power Plant |
– |
52 |
Banyan CCP4 Project |
Singapore |
Insulation Coordination Study for (PSCAD) 400kV GIS ▪ Temporary Over Voltage ▪ Slow Front Overvoltage ▪ Fast Front Overvoltage • Transformer Energization Study • PSS Voltage Regulator Stability Study • Transient Stability Study |
Sembcorp |
YD Consulting |
Power Plant |
PSCAD / ETAP/ Matlab |
PHARMA
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Suven Pharma |
Hyderabad |
Arc Flash studies |
Sri Gayathri energy services |
Sri Gayathri energy services |
Pharmaceutical |
ETAP |
2 |
Suven Pharma Ltd |
Andhra Pradesh |
Arc Flash |
Suven Pharma |
Sri Gayatri energy services |
Pharmaceutical |
ETAP |
3 |
Dasami Lab Pvt Ltd |
Andhra pradesh |
Short Circuit Studies, Relay Coordination Studies, Arc Flash |
DASAMI LAB PVT LTD |
DASAMI LAB PVT LTD |
Pharmaceutical |
ETAP |
4 |
Laurus Lab Ltd – Unit 3, 4 & 6 |
Andhra Pradesh |
Short Circuit Studies, Relay Coordination Studies, Arc Flash |
Laurus lab ltd |
Sri Gayatri energy services |
Pharmaceutical |
ETAP 20.5 |
5 |
Hetero Drugs Ltd |
India |
Arc Flash Studies |
HETROS LAB |
SAFEECO |
Pharmaceutical |
ETAP |
6 |
RA Chem Pharma Ltd |
Hydrabad |
Arc Flash Study |
Cohance |
Cohance |
Pharmaceutical |
ETAP 20 |
7 |
Lauras Labs Ltd |
Andhra pradesh |
Arc flash studies |
Lauras Lab |
Gayathri |
Pharmaceutical |
ETAP |
8 |
Porus Laboratories Units – Atchutapuram and Parwada |
Visakhapatnam,India |
Arc flash |
Porus Labs |
Porus Labs |
Pharmaceutical |
ETAP |
ELECTRICAL UTILITIES
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
ISINYA 220kV Substation |
Kenya |
Trp Matrix, InterConnection Diagram Interlock Diagram, Protection Schemes |
NCC |
Nissi Engineering |
Electric Utilities |
N/A |
2 |
Frajafail – 420 / 300 /132 kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Electric Utilities |
PSCAD |
3 |
Sierra Leone Transmission Planning |
Sierra Leone |
Grid Impact Study ( i. Short Circuit Study ii. Power Quality Study (Harmonic Disturbance, Flicker) iii. Grid Compliance Analysis comply with Grid Code iv. Active Power Control v. Frequency Response Analysis vi. Reactive Power Support ) |
Thiraipuram |
Thiraipuram |
Electric Utilities |
ETAP 19.5 |
4 |
66kV Double Circuit Transmission Line |
Jordan |
Insulation Coordination |
Theji Constructions Pvt Ltd |
Theji Constructions Pvt Ltd |
Electric Utilities |
PSCAD |
5 |
110/38kV Substation |
Ireland |
Insulation Coordination |
Substation Engineers |
Substation Engineers |
Electric Utilities |
PSCAD |
6 |
GOSP4 115 kV Substation |
Saudi Arabia |
Insulation Coordination |
GE |
Ingenious Network FZC, UAE |
Electric Utilities |
PSCAD |
7 |
ZULUF 230 kV Substation |
Saudi Arabia |
Insulation Coordination |
GE |
Ingenious Network FZC, UAE |
Electric Utilities |
PSCAD |
MICRO GRID
1 |
Sterling Wilson Chennai |
Chennai |
Microgrid Consulting Services |
Sterling Wilson |
Sterling Wilson |
Microgrid and Energy Storage |
ETAP DigSILENT PSSE PSCAD HOMER |
2 |
30 MW Solar Power Plant |
Senegal |
BESS Optimisation |
Avant-garde |
Avant-garde |
Microgrid and Energy Storage |
HOMER |
3 |
Pyramid Lake microgrid project |
USA |
Load Flow, Short circuit, Grounding, Relay coordination, ArcFlash |
Maxwell faraday |
Maxwell faraday |
Microgrid |
ETAP |
4 |
Burnt Peak microgrid project |
USA |
Load Flow, Short circuit, Grounding, Relay coordination, ArcFlash |
Maxwell faraday |
Maxwell faraday |
Microgrid |
ETAP |
MINERALS AND MATERIALS
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Kalyani Steels Ltd |
India |
Load flow, Short Circuit, Relay coordination, Unit Protection, Arc flash Studies |
Kalyani Steel |
RELTEC |
Minerals & Metals |
ETAP 20.5 |
2 |
3 MTPA Paste Fill Plant |
Madhya Pradesh |
Load Flow & Short Circuit Study Report Motor Starting Study Report Harmonics Study Report Relay coordination study Report |
Hindusthan Copper Ltd |
RDB Encon |
Minerals & Metals |
ETAP 20.5 |
3 |
Coromandel International Ltd |
Andhra pradesh |
Load Flow, Short circuit, Motor starting Transienrt stablity Relay coordination, |
Coromandel |
Coromandel |
Minerals & Metals |
ETAP 21 |
4 |
Iron ore handing and evacution system |
Odisha |
Relay Coordination |
Odisha Mining Corporation |
HOWE / TEED |
Minerals & Metals |
ETAP 21 |
AIRPORT & PORT
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Dammam Airport |
Saudi Arabia |
Short Circuit Studies Relay Coordination |
Synergy |
Pothigai Power Systems |
Airports |
ETAP 16 |
2 |
KFIA Damman Airport |
Saudi Arabia |
Load Flow studies Short Circuit Studies Relay Coordination |
Synergy |
Pothigai Power Systems |
Airports |
ETAP 19 |
3 |
Hamad International Airport |
Qatar |
Short Circuit Studies, Relay Coordination Study and Arc Flash Study |
Winstar Electromechanical Qatar |
Winstar Electromechanical |
Airports |
ETAP 20.0 |
4 |
New port Qatar Airport |
Qatar |
Protection co-ordination |
ABB |
Kestral |
Airports |
ETAP 20.0 |
5 |
Jawaharlal Nehru Port |
India |
Load flow, Short circuit, Motor Starting, Relay co-ordination, Arc flash |
JNPT |
RINA |
Airports |
ETAP 20.0 |
6 |
Jeddah Airport |
Saudi Arabia |
Load flow, Short circuit, Motor acceleration studies, Relay Coordination, Arc flash studies, Harmonic Analysis |
Jeddah Althaniya Water Company (JAWC) |
Saudi Services for Electro Mechanic Works Co. (SSEM) |
Airports |
ETAP 20.0 |
7 |
Fujarah Airport |
Saudi Arabia |
Relay Coordination |
– |
KESTREL |
Airports |
ETAP 20.0 |
8 |
Noida International Airport |
Uttar Pradesh,India |
Load Flow, Short Circuit, Motor Starting Relay coordiantion, Arc Falsh Insulation Cordination Traning on ETAP |
Noida Internationl Airport |
Tata Projects |
Airports |
ETAP / PSCAD |
9 |
Dubai International Airport |
UAE |
Corodination study |
Etisalat |
DULAND TECHNICAL SERVICES LLC |
Airports |
ETAP 21 |
10 |
Lucknow international airport |
Lucknow |
Load Flow, Short circuit |
Adani |
Egis India |
Airports |
ETAP 21 |
POWER PLANT
Sl.No |
Project |
Location |
Scope |
Client |
Sector |
Software |
1 |
2 * 379.1 MW Open Cycle Gas Plant |
Singapore |
Insulation Coordination , Transformer Energisation , PSS Voltage regulator Stability, Transient Stability |
YD Consultant |
Power Plant |
ETAP PSCAD |
2 |
600MW Advanced Gas turbine cogeneration combined Cycle Gas Plant |
Singapore |
Insulation Coordination , Transformer Energisation , PSS Voltage regulator Stability, Transient Stability |
YD Consultant |
Power Plant |
ETAP PSCAD |
3 |
250MW Lignite Fired Power Plant, Neyveli |
India |
Arc Flsah |
TAQA Neyveli Power Company Pvt, Ltd |
Power Plant |
ETAP |
4 |
2 * 600 MW Thermal Plant, Madhya Pradesh |
India |
Load Flow, Short Circuit, Motor Starting |
Tata Consulting Engineers Pvt Ltd |
Power Plant |
ETAP |
5 |
26MW Hydro Plant, Vietnam |
Vietnam |
Short Circuit |
BFL |
Power Plant |
ETAP |
6 |
120MW Therman Plant, Gummudipoondi |
India |
Transformer Enegisation |
Suryadev |
Power Plant |
ETAP |
7 |
2 * 72 MW Thermal Plant, Singapore |
Singapore |
Load Flow, Short Circuit, Motor Starting, Transient Stability, Relay Coordination, Harmonic Analysis |
ABB SG |
Power Plant |
ETAP |
8 |
2 * 660MW Thermal Power Plant TPCIL, Nellore |
India |
Relay Coordination |
Sempcorp |
Power Plant |
ETAP |
9 |
98MW Hydro Plant, Malaysia |
Malaysia |
Load Flow, Short Circuit, N-1 Contigency, Dynamic Study |
Uniten |
Power Plant |
ETAP |
10 |
DUBA Combine Cycle Power Plant, Saudi |
Saudi Arabia |
Arc Flash |
Saudi Electricity Company |
Power Plant |
ETAP |
11 |
Almarai 40MW Power Plant, Saudi |
Saudi Arabia |
Relay Coordination |
Pothigai Power |
Power Plant |
ETAP |
MANUFACTURING SECTOR
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
GE Industrial Complex |
India |
Arc Flash studies |
GE |
GE |
Manufacturing |
ETAP 20.5 |
2 |
33 kV Switchgear |
UAE |
CT Sizing Low Impedance Busbar Differential Protection |
ACUME |
ACUME |
Manufacturing |
ETAP 20.5 |
3 |
Qatar Gas Operating Company Ltd |
Qatar |
Relay Coordination |
Petrotec |
Petrotec |
Manufacturing |
ETAP 20.5 |
4 |
JCB Manufacturing Unit |
India |
Arc flash STudies |
JCB |
SGS Controls |
Manufacturing |
ETAP 20.5 |
5 |
Qatar gas Operating Company Ltd |
Qatar |
Relay Coordination |
Winstar Electromechanical Qatar |
WINSTAR |
Manufacturing |
ETAP 20.5 |
6 |
Jatim Steel |
Indonesia |
Relay Coordination |
Jatim Steel |
ABB |
Manufacturing |
ETAP 20.5 |
7 |
Suguna Spong & power Private Ltd |
Thadipatri |
Load flow, Short Circuit Studies, Transient Stability,Harmonic Study, Relay Coordination Study |
Suguna Spong & power |
Suguna Spong & power |
Manufacturing |
ETAP 20.5 |
8 |
Hamad International Airport – 5 Substation Expansions |
Qatar |
Load flow, Short Circuit Studies, Relay Coordination Study and Arc Flash Study |
Winstar Electromechanical Qatar |
Winstar Electromechanical |
Manufacturing |
ETAP 20.5 |
9 |
Addverb Technologies |
Noida |
Arc flash |
Addverb |
Addverb |
Manufacturing |
ETAP 20.5 |
10 |
TREI |
VIZAG |
Arc Flash |
TREI |
TREI |
Manufacturing |
ETAP 20.5 |
11 |
Bill forge |
Bangalore |
Arc flash, LPS & Electrical Safety Audit |
RELTEC |
RELTEC |
Manufacturing |
ETAP 20.5 |
12 |
Laurus lab Ltd |
VIZAG |
Arc Flash |
Sri gayathri |
Sri gayathri |
Manufacturing |
ETAP 20.5 |
13 |
TITAN Manufacturing Plant |
Hosur |
Arc flash & LPS |
TITAN |
TITAN |
Manufacturing |
ETAP 20.5 |
14 |
Mahindra CIE Automotive Ltd, Plant IV |
Coimbatore |
Arc Flash Study & Electrical Safty Audit |
Mahindra CIE Ltd |
RELTEC |
Manufacturing |
ETAP |
15 |
33/11kV Cement plant |
Oman |
Load flow & Contingency Study Short circuit study Harmonic system study Protection coordination study Transient study Grid Islanding & Load shedding study |
– |
HES |
Manufacturing |
DigSILENT |
16 |
12 MW RDF Based WtE Power Plant |
Delhi, India |
Harmonic measrement RCA |
Indoenviro |
Indoenviro |
Manufacturing |
N/A |
17 |
Kreative Organic Private Ltd |
hyderabad, india |
Arc Flash |
Kreative Organic pvt. ltd |
Sri gayathri |
Manufacturing |
ETAP 20.5 |
18 |
220/33kV Substation |
Insulation Coordination |
Tata Steel |
Siemens |
Manufacturing |
PSCAD & ETAP |
|
19 |
Numaligarh Refiniery Ltd |
Assam, India |
Load Flow & Short Circuit Study Report Motor Starting Study Report Harmonics Study Report Transient Stability Study Report (Optional) Load Shedding Study Report (Optional) Relay coordination study Report \ |
Numaligarh Refinery Limited |
Tecnip / Tecton |
Manufacturing |
ETAP 20 |
20 |
ST Telemedia Global Data Centres |
Delhi, India |
Load Flow Report Short Circuit Report Relay coordination study Report |
ST TELEMEDIA GLOBAL DATA CNETRES |
Crescon projects and services Pvt. Ltd. |
Manufacturing |
ETAP 20 |
21 |
Manpower Support |
Oman |
Manpower Support for Engineering |
– |
HES |
Manufacturing |
ETAP 20 |
22 |
Bill Forge Unit 3 |
Bangalore |
Arc flash Label Supply |
Mahindra CIE Automotive Limited |
Mahindra CIE Automotive Limited |
Manufacturing |
N/A |
23 |
Aurobindo Pharma Ltd |
Hyderabad |
Arc flash studies |
M/s. Aurobindo Pharma |
Indus |
Manufacturing |
ETAP |
24 |
Wells Lighting Installation |
Iraq |
Lighting Design |
ZPOD |
KSS energy consultants |
Manufacturing |
Dialux |
25 |
Carboline India Private Limited Coatings and fireproofing |
Chennai, India |
Arc flash study |
Carboline |
Carboline |
Manufacturing |
ETAP |
26 |
Akyem Open-Pit Gold Mine |
Ghana |
Arc flahs study |
Teslaghana |
Teslaghana |
Manufacturing |
ETAP |
27 |
Mahendra CIE Bill Forge Ltd |
Bangalore |
Lighting Protection Study |
Mahendra CIE Bill Forge |
Manunath Electricals |
Manufacturing |
– |
28 |
220kV GIS Substation for Manufacturing Unit of LI-ION Cell |
India |
Insulation Coordination Transformer Energisation Ferro Resonance Relay Coordination Unit Protection Cable Sizing LV Power and Control Cable Schedule Engineering |
Exide Battery |
Hitachi |
Manufacturing |
PSCAD |
29 |
IOLCP Plant |
Punjab, India |
Arc Flash |
IOLCP |
IOLCP |
Manufacturing |
ETAP |
30 |
Hertz Electricals – Schaeffler |
Hosur, India |
Arc Flash |
Schaffler |
Hertz Electricals |
Manufacturing |
ETAP |
31 |
Teleflex Private Limited |
Puducherry |
Arc Flash |
Teleflex |
Teleflex |
Manufacturing |
ETAP |
PROCESS INDUSTRY
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Tasek Cement Plant |
Malaysia |
Load Flow Studies Short Circuit Studies Motor Starting Studies Transient Stability Studies Harmonic Analysis Relay Coordination |
Tasek Bhd |
RS Consultants |
Process Industry |
ETAP 14 |
2 |
Pepsi Food Production Plant |
Dammam – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 14 |
3 |
Pepsi Food Production Plant |
Jeddah – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 14 |
4 |
Pepsi Food Production Plant |
Riyadh – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 14 |
5 |
Hero R&D and Production |
Kukas Jaipur Rajasthan – India |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
Hero MotoCorp |
ModPro Engineers |
Process Industry |
ETAP 14.1 |
6 |
Hero Production |
Gujarath – India |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
Hero MotoCorp |
ModPro Engineers |
Process Industry |
ETAP 14.1 |
7 |
Hero Production |
Niloy – Bangladesh |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
Hero MotoCorp |
ModPro Engineers |
Process Industry |
ETAP 14.1 |
8 |
SA-2 Extension |
Kingdom of Saudi Arabia |
Short Circuit Studies Motor Starting Studies Relay Coordination CT Sizing Earthing Studies |
Nutek |
Nutek |
Process Industry |
ETAP 14.1 |
9 |
Honda Motor Cycle & Scooters India Pvt Ltd |
India |
NGR Sizing Calculation |
Hero MotoCorp |
ModPro Engineers |
Process Industry |
N/A |
10 |
Brittania Industies |
Rudrapur |
Safety Audit Overcurrent and Earth Fault Relay Coordination |
Brittania Industries |
Voltech |
Process Industry |
ETAP 14.1 |
11 |
KAPSARC |
Saudi Arabia |
Short Circuit Studies Relay Coordination |
Synergy – Saudi Arabia |
Pothigai Power Systems |
Process Industry |
ETAP 14 |
12 |
Omega CS_1805020 |
Qatar |
Load flow studies Short Circuit Studies Relay Coordination Arc Flash Studies |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Process Industry |
ETAP 18 |
13 |
CP5 |
Qatar |
Short Circuit Studies Relay Coordination |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Process Industry |
ETAP 19 |
14 |
Biolab – Train 1 Expansion |
Saudi Arabia |
Load Flow studies Short Circuit Studies Relay Coordination Arc Flash Studies |
Biolab |
MRM |
Process Industry |
ETAP 19 |
15 |
Mylan Pharma Industries Ltd- Unit 8 |
Vizag |
Short Circuit Studies Relay Coordination Arc Flash Studies |
Mylan |
Mylan |
Process Industry |
ETAP 19 |
16 |
Mylan Pharma Industries Ltd- Unit 9 |
Vizag |
Short Circuit Studies Relay Coordination Arc Flash Studies |
Mylan |
Mylan |
Process Industry |
ETAP 19 |
17 |
Baby Whipes |
Saudi Arabia |
Load Flow studies Short Circuit Studies Relay Coordination |
Synergy |
Pothigai Power Systems |
Process Industry |
ETAP 19 |
18 |
Arabian Petrochemical Company, Al-Jubail |
Saudi Arabia |
Short Circuit Studies Relay Coordination |
Madhura Consultants |
Ingenious Network India Private Limited |
Process Industry |
ETAP 19 |
19 |
Pepsi Food Production Plant |
Jeddah – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 19 |
20 |
Pepsi Food Production Plant |
Riyadh – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 19 |
21 |
Savannah Cement Plant |
Kenya |
Short Cicuit Studies Relay Coordination Studies |
Flsmith |
ModPro Engineers |
Process Industry |
ETAP 19 |
22 |
Mylan Pharma Industries Ltd |
Nashik |
Short Circuit Studies Relay Coordination Arc Flash Studies |
Mylan |
Mylan |
Process Industry |
ETAP 19 |
23 |
SFSF |
Saudi Arabia |
Short Circuit Studies Relay Coordination Arc Flash Studies |
ABB Saudi |
KESTREL |
Process Industry |
ETAP 19.5 |
24 |
Petrochad |
Chad |
Load Flow studies Short Circuit Studies Relay Coordination |
Petrochad |
Network India Priva |
Process Industry |
ETAP 19 |
25 |
KMML |
Kerala |
Load Flow studies Motor Starting Studies |
KMML |
ModPro Engineers |
Process Industry |
ETAP 19.5 |
26 |
NMDC |
Load Flow Studies Short Circuit Studies |
NMDC |
VADIM Infrastructure (VIPL) |
Process Industry |
ETAP 19.5 |
|
27 |
Saline water conversion corporation, water treatment plant |
Saudi Arabia |
Short Circuit Studies, Relay Coordination Studies |
Pothigai Power |
Pothigai Power |
Process Industry |
ETAP 19.5 |
28 |
Abu ghonema mountain tanks |
Saudi Arabia |
Short Circuit Studies, Relay Coordination Studies |
Pothigai Power |
Pothigai Power |
Process Industry |
ETAP 19.5 |
29 |
Coca Cola Production Plant |
Saudi Arabia |
Short Circuit Studies, Relay Coordination Studies |
Pothigai Power |
Pothigai Power |
Process Industry |
ETAP 19.5 |
30 |
New Naval Base Project |
Saudi Arabia |
Short Circuit Studies, Relay Coordination, Unit Protection |
ABB Saudi |
KESTREL |
Process Industry |
ETAP 19.5 |
31 |
MV and LV Switchgear of Cooling Plant |
Doha, Qatar |
Review of Protection Coordination Study |
Winstar Electromechanical Qatar |
Winstar Electromechanical |
Process Industry |
ETAP 20.0 |
32 |
10 * 2 MW Diesel Generator Plant |
India |
Short Circuit Studies and Relay Coordination Study |
Mak Controls |
Mak Controls |
Process Industry |
ETAP 20.0 |
33 |
Ramagundam Fertilizers Complex (RFCL) |
India |
Short Circuit Studies and Relay Coordination Study |
Thiraipuram |
Thiraipuram |
Process Industry |
ETAP 20.0 |
34 |
VOPAK |
Saudi Arabia |
Short Circuit Studies and Relay Coordination Study |
KESTREL |
KESTREL |
Process Industry |
ETAP 20.0 |
35 |
11 kV Switchgear Retrofit |
Qatar |
Relay Coordination Study |
Winstar Electromechanical Qatar |
Winstar Electromechanical |
Process Industry |
ETAP 20.0 |
36 |
Aurrel i-TechIES Private Limited |
India |
Arc Flash Study and TS |
GE |
Aurrel i-TechIES Private Limited |
Process Industry |
ETAP 20.0 |
37 |
Port – IVORY COAST |
IVORY COAST |
Load Flow, SHort Circuit, Motor Starting, Relay Coordination |
RINA |
RINA |
Process Industry |
ETAP 20.0 |
38 |
Protection Coordination |
Saudi Arabia |
Relay Coordination |
Ingenious |
Ingenious |
Process Industry |
ETAP 20.0 |
39 |
10 * 2 MW Diesel Generator Plant |
India |
Short Circuit Studies and Relay Coordination Study |
Mak Controls |
Mak Controls |
Process Industry |
ETAP 20.0 |
40 |
Q Terminal |
Saudi Arabia |
Relay Coordination |
KESTREL |
KESTREL |
Process Industry |
ETAP 20.0 |
41 |
Shree Cements |
India |
Harmonics, VFD, Motor, PLC |
Shree Cements |
Shree Cements |
Process Industry |
N/A |
42 |
National Fertilizer Limited |
India |
Load flow, Short Circuit, Relay coordination, Unit Protection, Arc flash Studies, Transient Stability |
National Fertilizer |
TCE |
Process Industry |
ETAP |
43 |
Oman National Grid |
Oman |
ETAP to DIgSILENT Conversion |
Hesman |
Hesman |
Process Industry |
DIsILENT |
44 |
Technical Feasibility Study for Decentralise Energy Project |
India |
Load Flow, Short Circuit, Tramsient Stability Transformer Energisation Cable Energisation |
ChakrInnovation |
ChakrInnovation |
Process Industry |
PSCAD |
45 |
CIE Hosur Limited |
India |
Arc Flash, Thermography Safety Audit LA Mapping |
CIE Hosur Limited |
CIE Hosur Limited |
Process Industry |
ETAP |
46 |
16 MVA Manufacturing Plant |
India |
Relay coordination |
Alcalab india Pvt Ltd |
Alcalab india Pvt Ltd |
Process Industry |
ETAP |
47 |
Godavari Biorefineries LTd |
India |
Relay coordination |
Reltec |
Reltec |
Process Industry |
ETAP |
48 |
Technical Feasibility Study for Decentralised Energy Project |
India |
Pre magnetizing Transformer Point on wave switching Synchronising 11kV |
ChakrInnovation |
ChakrInnovation |
Process Industry |
PSCAD |
49 |
Plate mill Revamp |
Singapore |
Load Flow, Short Circuit, Relay coordination, |
ABB SG |
ABB SG |
Process Industry |
ETAP |
50 |
Training on substation Design Engineering |
Oman |
Detailed Engineering Training |
DEC |
DEC |
Process Industry |
Excel |
51 |
Crystal Industrial Park B-400 Bhayla (COCA-COLA WAREHOUSE) |
Ahmedabad, India |
Arc Flash Study |
FABS Management Services PTE Ltd. |
FABS Management Services PTE Ltd. |
Process Industry |
ETAP |
WATER TREATMENT PLANT
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
BUWAIB Water treatment |
Riyadh, Kingdom of Saudi Arabia |
Load Flow Studies Short Circuit Studies Relay Coordination Arc Flash Studies Insulation Coordination |
Madhura Consultants |
Water Treatment |
ETAP 14.1 |
|
2 |
District Cooling Plant |
Malaysia |
Load flow studies Short Circuit Studies Static and Dynamic Motor Starting Studies Transient Stability Studies Relay Coordination Arc Flash Studies Optimal Power flow |
GDC Cooling District |
Limitless Green Technology |
Water Treatment |
ETAP 14 |
3 |
Manpower Support for Engineering |
Singapre |
Manpower Support for Engineering |
Nexvision power & Automation |
Nexvision power & Automation |
Water Treatment |
N/A |
4 |
Al Mostawi Reservoir |
Saudi Arabia |
Relay Coordination |
MEWA |
SSEM |
Water Treatment |
ETAP |
5 |
AD Dhakhiliyah water transmission system |
Oman |
Relay Coordination Study |
DIAM |
L&T |
Water Treatment |
ETAP |
6 |
Shoaiba-Quaiza B Water Transmission System |
Jeddah,Saudi |
Detailed Engineering |
Water Transmission and Technologies Co. |
SASEC Engineering |
Water |
N/A |
7 |
726.6MW Combine Cycle Power Plant |
Thipura,India |
Feasibility Engineering |
ONGC Tripura Power Company Ltd |
ONGC Tripura Power Company Ltd |
Water |
AutoCAD |
8 |
Electrical System Study for 726 MW Combined Cycle Power plant |
India |
Electrical System Study |
ONGC Tripura Power Company Ltd |
ONGC Tripura Power Company Ltd |
Water |
ETAP |
INFRASTRUCTURE
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Doha Mall |
Qatar |
Harmonic Study |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Infrastructures |
ETAP 16 |
2 |
Abu Hamour Mall |
Qatar |
Short Circuit Studies Relay Coordination |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Infrastructures |
ETAP 19 |
3 |
Al Rayan Stadium |
Qatar |
Short Circuit Studies Relay Coordination |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Infrastructures |
ETAP 19 |
4 |
Training on Insulation Coordination using PSCAD |
Banglore |
Training for Insulation Coordination |
Balfour Beatty |
Balfour Beatty |
Infrastructures |
PSCAD |
5 |
HALUL & NFA Complex |
Qatar |
Load flow, short circuit, Relay coordination |
Qatar Energy |
Converse Technologies |
Infrastructures |
ETAP |
6 |
Changdad Substation |
India |
Relay coordination |
Olam agro |
Reltec |
Infrastructures |
ETAP |
SUBSTATIONS
Sl.No |
Project |
Location |
Scope |
Client |
Sector |
Software |
1 |
220kV GIS Substation for Manufacturing Unit of LI-ION Cell, Exide Energy Solution Limited |
India |
Insulation Coordination, Transformer Energisation, Ferro Resonance |
Hitachi |
Manufacturing |
PSCAD |
2 |
600MW OGCT Plant |
Singapore |
Insulation Coordination, PSS Tuning study, Transient Stability Study, Transformer Inrush Study |
YD Consultant |
Power Plant |
PSCAD |
3 |
2*379.1MW OGCT Plant |
Singapore |
Insulation Coordination, PSS Tuning study, Transient Stability Study, Transformer Inrush Study |
YD Consultant |
Power Plant |
PSCAD |
4 |
Reliance Life Sciense, Nashik |
India |
Insulation Coordination Study |
Siemens |
Power |
PSCAD |
5 |
TATA Steel, Meeramandli |
India |
Insulation Coordination Study |
Siemens |
Manufacturing |
PSCAD |
6 |
300MW Solar PV Project |
Saudi Arabia |
Insulation Coordination Study |
Sgurr Energy |
Solar |
PSCAD |
7 |
Noida International Airport Project |
India |
Insulation Coordination Study |
TATA Projects |
Airport |
PSCAD |
8 |
Technical Feasibility Study for Decentralise Energy Project |
India |
Transformer Energisation, Cable Energisation, Point on wave switching, Premagnetizing Transformer, Synchronising Panel |
ChakrInnovation |
Process |
PSCAD |
9 |
PSCAD simulation Model / For Open Access Kamuthi Project |
India |
Reactive power compensation |
Enerparc Energy Private Limited |
Solar |
PSCAD |
10 |
Nxtra Data Center, Pune |
Pune |
Transformer Energization studies |
Sterling Wilson |
Data Center |
PSCAD |
11 |
STT Data Center, Chennai |
Chennai |
Transformer Energization studies |
STT |
Data Center |
PSCAD |
12 |
Indian oil Corporation Ltd, Vadodara |
Gujarat |
Insulation Co-ordination Study, Harmonics Studies, |
Siemens |
Oil and Gas |
PSCAD |
13 |
800MWp AL KHARSAAH PV PQ |
Qatar |
Power Quality analysis |
Power Chinar |
Solar |
PSCAD |
14 |
120 MW Thermal Plant |
Gummudipoondi |
Transformer Energization studies |
Suryadev |
Power Plant |
PSCAD |
15 |
Garvagh 38kV Substation |
Ireland |
Insulation Coordination Study |
Substation Engineers |
Wind |
PSCAD |
16 |
Carickallen 38kV Substation |
Ireland |
Insulation Coordination Study |
Substation Engineers |
Wind |
PSCAD |
17 |
Magheramore 38kV Substation |
Ireland |
Insulation Coordination Study |
Substation Engineers |
Wind |
PSCAD |
18 |
ESB & ESK 110/38kV Substation |
Ireland |
Insulation Coordination Study |
Substation Engineers |
Wind |
PSCAD |
19 |
Frajafail – 420 / 300 /132 kV Substation |
Ireland |
Insulation Coordination Study |
Substation Engineers |
Electric Utilities |
PSCAD |
20 |
66kV D/C TL |
Jordan |
Insulation Coordination Study |
Theji Constructions Pvt Ltd |
Electric Utilities |
PSCAD |
21 |
GOSP4 115 kV Substation |
Saudi Arabia |
Insulation Coordination Study |
Ingenious Network FZC, UAE |
Electric Utilities |
PSCAD |
22 |
ZULUF 230 kV Substation |
Saudi Arabia |
Insulation Coordination Study |
Ingenious Network FZC, UAE |
Electric Utilities |
PSCAD |
23 |
110/38 kV Rosspile /Gillinstown |
Ireland |
Insulation Coordination Study |
Substation Engineers |
Wind |
PSCAD |
24 |
AL BARAHA Super 1 GIS – 400/220 kV |
Qatar |
Insulation Coordination Study |
L&T ECC |
Power |
PSCAD |
25 |
SB Energy |
Rajasthan |
Harmonic Resonance studies |
SB Energy |
Solar |
PSCAD |
26 |
110/38 kV Rosspile /Gillinstown |
Ireland |
Insulation Coordination Study |
H&MV |
Wind |
PSCAD |
27 |
APOC PDH – UTOS 220 kV GIS Substation |
Saudi Arabia |
Insulation Coordination Study |
Ingenious |
Process |
PSCAD |
28 |
Integration of Wind and BESS with FPSO |
Singapore |
Transformer Energization studies |
BWO Offshore |
Offshore |
PSCAD |
29 |
220/33kV Wind Farm Pooling Substation, Kachchh |
India |
Insulation Coordination Study |
NS Engineers |
Wind |
PSCAD |
RAIL
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Nagpur Metro |
Nagpur |
Power Factor Correction study |
Maha Metro |
Maha Metro |
Rail |
ETAP 19.5 |
2 |
DB Engineering & Consultant GMH |
Bangalore |
Detail engineering |
DB Engineering & Consultant GMH |
DB Engineering & Consultant GMH |
Rail |
Excel templates Inhouse Tools |
3 |
Serbia Detail design- Traction Power |
Serbia |
Traction power detail design |
DB |
DB |
Rail |
Excel templates Inhouse Tools |
FUEL CELL
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
2.5MW Fuel Power Plant |
Intel office, Bangalore |
Load flow studies Short Circuit Studies Relay Coordination Arc Flash Studies |
Intel, Bloom Energy |
L&T ECC |
Fuel Cell |
ETAP 14 |
2 |
6.5MW Solar Plant + BESS + 5.5MW Electrolyser |
– |
Load Flow, Short circuit, Transient Stability |
Replus |
Replus |
Fuel Cell |
DigSILENT |
3 |
2.81MWp Solar+369kWh/738kW BESS+1.69MW Electrolyser Green Hydrogen Plant |
– |
DC Load flow Short Circuit study report Stability Study Report |
Hygenco |
Hygenco |
Fuel Cell |
DigSILENT |
BESS
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
25 MW Solar and Battery Energy System |
USA |
Homer pro 25 MW AC Solar power plant |
– |
Avant Garde |
BESS |
Homer Pro |
2 |
Port of Tyne, NewCastle BESS |
UK |
Short circuit studies, Protection Coordination Studies |
RES |
EPS |
BESS |
ETAP/ DigSILENT |
3 |
2*100MW BESS Grid booster project |
German |
PSS |
Fluence |
BESS |
DigSILENT |
MANPOWER SUPPORT
Sl.No |
Project |
Location |
Scope |
Client |
Sector |
Software |
1 |
Serbia Detail design- Traction Power |
India |
Traction power detail design |
DB Engineering & Consultant GMH |
Manpower Support |
N/A |
2 |
Microgrid and Energy Storage |
India |
Microgrid Consulting |
Sterling and Wilson Pvt Ltd |
Manpower Support |
ETAP |
3 |
AD Dhakhiliyah water transmission system |
UAE |
Load flow, Short Circuit, Relay Coordination |
L&T |
Manpower Support |
ETAP |
4 |
ETAP Engineer |
India |
Load flow, Short Circuit, Motor Starting, Harmonic analysis, Relay Coordination |
Nissi |
Manpower Support |
ETAP |
5 |
Digsilent Engineer |
Saudi |
Load flow, Short Circuit, Motor Starting, Harmonic analysis, Relay Coordination |
Ritaj Engineers and Consultant |
Manpower Support |
Digsilent |
6 |
Detailed Design Engineer |
Singapore |
Detailed Design Engineering |
Nexvision power & Automation |
Manpower Support |
N/A |
7 |
Detailed Design Engineer |
India |
Detailed Design Engineering |
Nordex |
Manpower Support |
N/A |
CORPORATE TRAINING
Sl.No |
Training |
Location |
Mode of class |
Scope |
Client |
Sector |
Software |
1 |
Grid Compliance Studies |
India |
Offline |
Training on PSSe & PSCAD |
NTPC |
Corporate Training |
PSCAD |
2 |
Insulation Coordination studies |
Chennai, India |
Offline |
Advacned PSCAD Training |
Hitachi |
Corporate Training |
PSCAD |
3 |
Insulation Coordination studies |
Bangalore, India |
Online |
Advanced PSCAD Training |
ABB |
Corporate Training |
PSCAD |
4 |
PSS tuning using PSSE |
Bangalore, India |
Online |
Advanced PSCAD Training |
ABB |
Corporate Training |
PSCAD |
5 |
Power System Study |
Durgapur,India |
Offline |
ETAP Training |
Pinacle Infotech |
Corporate Training |
ETAP |
6 |
Power System Study |
India |
Offline |
ETAP Training |
RND Power Engineer |
Corporate Training |
ETAP |
7 |
Power System Studies |
India |
Offline |
Digsilent Training |
Ramboll India Pvt. Ltd |
Corporate Training |
DigSILENT |
8 |
Insulation Coordination Studies |
India |
Online |
PSCAD Training |
Kent |
Corporate Training |
PSCAD |
9 |
Power System Studies |
UAE |
Online |
ETAP Training |
Dragon oil |
Corporate Training |
ETAP |
10 |
Lighting Control Design |
India |
Online |
Lighting control design Training |
Pinacle Infotech |
Corporate Training |
ETAP |
11 |
Power System Study |
India |
Offline |
ETAP Training |
RND Power Engineer |
Corporate Training |
ETAP |
12 |
Detail Engineering |
Muscut |
Online |
DE Training |
Tracez |
Corporate Training |
– |
13 |
Insulation Coordination study |
Ahemadabad |
Offline |
PSCAD Training |
Adani |
Corporate Training |
PSCAD |
14 |
Insulation Co-ordination and PSS Tuning study |
Srilanka |
Offline |
PSCAD Training |
YD |
Corporate Training |
PSCAD |
15 |
Grid Compliance Studies for Renewables |
India |
Online |
Transient Stability, Grid Compilance study |
Atkins |
Corporate Training |
DigSILENT |
16 |
Power system analysis |
India |
Online |
Load flow, short circuit, Relay coordination |
SEIL ENERGY |
Corporate Training |
ETAP |
COUNTRIES
INDIA
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Hero R&D and Production |
Kukas Jaipur Rajasthan – India |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
Hero MotoCorp |
ModPro Engineers |
Process Industry |
ETAP 14.1 |
2 |
Hero Production |
Gujarath – India |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
Hero MotoCorp |
ModPro Engineers |
Process Industry |
ETAP 14.1 |
3 |
Hero Production |
Niloy – Bangladesh |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
Hero MotoCorp |
ModPro Engineers |
Process Industry |
ETAP 14.1 |
4 |
1 MW Solar Power Plant |
Erulapatti, India |
Pre feasibility Study |
RK Energy |
Solar |
PVSYST |
|
5 |
2 * 660MW Thermal Power Plant TPCIL |
Nellore, India |
Relay Coordination Studies |
SempCorp |
Nissi Engineering |
Power |
ETAP 14.1 |
6 |
Honda Motor Cycle & Scooters India Pvt Ltd |
India |
NGR Sizing Calculation |
Hero MotoCorp |
ModPro Engineers |
Process Industry |
N/A |
7 |
Brittania Industies |
Rudrapur |
Safety Audit Overcurrent and Earth Fault Relay Coordination |
Brittania Industries |
Voltech |
Process Industry |
ETAP 14.1 |
8 |
2.5MW Fuel Power Plant |
Intel office, Bangalore |
Load flow studies Short Circuit Studies Relay Coordination Arc Flash Studies |
Intel, Bloom Energy |
L&T ECC |
Fuel Cell |
ETAP 14 |
9 |
Indian Navy |
Vizag |
Short Circuit Studies Relay Coordination |
Mak Controls |
Voltech |
Offshore |
ETAP 14 |
10 |
50 MWp in Dummakhedi Solar Power Plant ( SITARA – 30 MWp L’Volta – 20 MWp) |
Madhya Pradesh, India |
Safety Audit |
Terraform |
Substation Engineers |
Solar |
N/A |
11 |
300 MW Terraform Windfarm |
Maharastra, India |
Safety Audit |
Terraform |
Substation Engineers |
Wind |
N/A |
12 |
Terraform 100MW Solar Power Plant |
Madhya Pradesh, India |
Safety Audit |
Terraform |
Substation Engineers |
Solar |
N/A |
13 |
Mylan Pharma Industries Ltd- Unit 8 |
Vizag |
Short Circuit Studies Relay Coordination Arc Flash Studies |
Mylan |
Mylan |
Process Industry |
ETAP 19 |
14 |
Mylan Pharma Industries Ltd- Unit 9 |
Vizag |
Short Circuit Studies Relay Coordination Arc Flash Studies |
Mylan |
Mylan |
Process Industry |
ETAP 19 |
15 |
M120 – 2 MW Full Converter (Type 4) Wind Turbine Generator Product Certification |
India |
Load Flow studies Short Circuit Studies LVRT Studies |
Senvion |
Senvion |
Wind |
DigSILENT |
16 |
M120 – 2 MW Full Converter (Type 4) Wind Turbine Generator Product Certification |
India |
Flicker Analysis Power Factor Requirement Studies Harmonic Analysis |
Senvion |
Senvion |
Wind |
DigSILENT |
17 |
Mudgal 20 MW Solar Power Plant |
Karnataka, India |
Power Evacuation Study |
SPML |
SPML |
Power |
ETAP 19 |
18 |
10 MW Solar Power Plant |
UP |
Power Evacuation Study |
ATRIA |
ATRIA |
Power |
ETAP 19 |
19 |
50 MW Solar Power Plant |
Hariyana |
Power Evacuation Study |
ATRIA |
ATRIA |
Power |
ETAP 19 |
20 |
Mylan Pharma Industries Ltd |
Nashik |
Short Circuit Studies Relay Coordination Arc Flash Studies |
Mylan |
Mylan |
Process Industry |
ETAP 19 |
21 |
ABB Bangalore |
India |
Transient Stability Studies User Defined Model Development for AVR, Governor Unit Protection Insulation Coordination |
Dangote |
EIL |
Oil & Gas |
ETAP PSCAD |
22 |
Sterling Wilson Chennai |
Chennai |
Microgrid Consulting Services |
Sterling Wilson |
Sterling Wilson |
Microgrid and Energy Storage |
ETAP DigSILENTPSCAD HOMER |
23 |
KMML |
Kerala |
Load Flow studies Motor Starting Studies |
KMML |
ModPro Engineers |
Process Industry |
ETAP 19.5 |
24 |
Nxtra Data Center |
Pune |
Load Flow Studies, Short Circuit Studies, Motor Acceleration Studies,, Transient Studies, Harmonic Analysis, Relay Coordination Studies, Arc Flash Studies, Earthing, Transformer Energisation Studies |
Microsoft, STT |
Sterling Wilson |
Data Center |
ETAP 19.5 PSCAD |
25 |
STT Data Center |
Chennai |
Load Flow Studies, Short Circuit Studies, Motor Acceleration Studies,, Transient Studies, Harmonic Analysis, Relay Coordination Studies, Arc Flash Studies, Earthing, Transformer Energisation Studies |
Microsoft, STT |
STT |
Data Center |
ETAP 19.5 PSCAD |
26 |
Nagpur Metro |
Nagpur |
Power Factor Correction study |
Maha Metro |
Maha Metro |
Rail |
ETAP 19.5 |
27 |
51 MW PV Solar Power Plant |
Madhya Padesh, India |
Power factor Correction and Power Quality study |
Renew Power |
– |
Solar |
ETAP 20.0 |
28 |
10 * 2 MW Diesel Generator Plant |
India |
Short Circuit Studies and Relay Coordination Study |
Mak Controls |
Mak Controls |
Process Industry |
ETAP 20.0 |
29 |
Ramagundam Fertilizers Complex (RFCL) |
India |
Short Circuit Studies and Relay Coordination Study |
Thiraipuram |
Thiraipuram |
Process Industry |
ETAP 20.0 |
30 |
Aurrel i-TechIES Private Limited |
India |
Arc Flash Study and TS |
GE |
Aurrel i-TechIES Private Limited |
Process Industry |
ETAP 20.0 |
31 |
10 * 2 MW Diesel Generator Plant |
India |
Short Circuit Studies and Relay Coordination Study |
Mak Controls |
Mak Controls |
Process Industry |
ETAP 20.0 |
32 |
27 MW Cogeneration Plant |
India |
Transient Stability Studies |
GE |
GE |
Power |
ETAP |
33 |
120 MW Thermal Power Plant |
Gummudipoondi |
Transformer Energisation |
Suryadev |
Suryadev |
Power |
PSCAD |
34 |
COLT Data Center |
Mumbai |
Load Flow, Short Circuit, Motor Starting, Harmonic Analysis, Transient Stability, Protection setting calculation in LV & MV, Unit protection, Arc Flash, Reliability Analysis |
COLT |
Sterling Wilson |
Data Center |
ETAP |
35 |
300MW Solar Power Plant |
Rajasthan |
Harmonic Resonance study |
SB Energy |
SB Energy |
Solar |
PSCAD |
36 |
Secondary Design and Layout |
Coimbatore |
Detail engineering |
Senvac |
Senvac |
Power |
N/A |
37 |
22 kV Substation and RMU |
Ethiopia |
Short circuit analysis |
IMEX |
IMEX |
Power |
ETAP |
38 |
Suven Pharma |
Hyderabad |
Arc Flash studies |
Sri Gayathri energy services |
Sri Gayathri energy services |
Pharmaceutical |
ETAP |
39 |
Training on Short Circuit Study |
Bangalore |
Training on Short Circuit Study |
BFL |
BFL |
Power |
PSCAD |
40 |
GE Industrial Complex |
India |
Arc Flash studies |
GE |
GE |
Manufacturing |
ETAP |
41 |
Irrigation Pumping Station – 16 MW SRIM |
Andhra Pradesh |
Motor acceleration studies |
– |
Radical power Solutions |
Power |
ETAP |
42 |
2 MW Rooftop Solar Power Plant |
Banglore |
Load Flow, Short Circuit |
HPCL |
Bataan solar |
Solar |
ETAP |
43 |
DB Engineering & Consultant GMH |
Bangalore |
Detail engineering |
DB Engineering & Consultant GMH |
DB Engineering & Consultant GMH |
Rail |
N/A |
44 |
DB Engineering & Consultant GMH |
Bangalore |
Detail engineering |
DB Engineering & Consultant GMH |
DB Engineering & Consultant GMH |
N/A |
N/A |
45 |
300 MW Solar Power Plant |
Rajasthan |
Load flow, Short circuit and Relay co-ordination |
Renew Power |
GE |
Solar |
ETAP |
46 |
Training on Insulation Coordination using PSCAD |
Banglore |
Training for Insulation Coordination |
Balfour Beatty |
Balfour Beatty |
Infrastructures |
PSCAD |
47 |
Jawaharlal Nehru Port |
India |
Load flow, Short circuit, Motor Starting, Relay co-ordination, Arc flash |
JNPT |
RINA |
Airports |
ETAP |
48 |
Suven Pharma Ltd |
Andhra Pradesh |
Arc Flash |
Suven Pharma |
Sri Gayatri energy services |
Pharmaceutical |
ETAP |
49 |
Dasami Lab Pvt Ltd |
Andhra pradesh |
Short Circuit Studies, Relay Coordination Studies, Arc Flash |
DASAMI LAB PVT LTD |
DASAMI LAB PVT LTD |
Pharmaceutical |
ETAP |
50 |
20 MW Solar Power Plant |
Karnataka, India |
Route Cause analysis |
ATRIA |
ATRIA |
Solar |
N/A |
51 |
2 * 600 MW Thermal Power Plant |
Anuppur, Madhya Pradesh |
l.oad flow, Short circuit and Motor acceleration studies |
MosearBear |
TCE |
Power |
ETAP |
52 |
Laurus Lab Ltd – Unit 3, 4 & 6 |
Andhra Pradesh |
Short Circuit Studies, Relay Coordination Studies, Arc Flash |
Laurus lab ltd |
Sri Gayatri energy services |
Pharmaceutical |
ETAP 20.5 |
53 |
65 MW Solar Power Plant |
India |
Relay coordination, Unit Protection |
REFEX |
ACE |
Solar |
ETAP |
54 |
Training on Power System studies using ETAP |
Coimbatore India |
ETAP Training |
NOVATEC |
NOVATEC |
N/A |
ETAP |
55 |
Kalyani Steels Ltd |
India |
Load flow, Short Circuit, Relay coordination, Unit Protection, Arc flash Studies |
Kalyani Steel |
RELTEC |
Minerals & Metals |
ETAP |
56 |
JCB Manufacturing Unit |
India |
Arc flash STudies |
JCB |
SGS Controls |
Manufacturing |
ETAP |
57 |
STT Data Center |
India |
Load flow, Short Circuit, Relay coordination, Unit Protection, |
STT Data Center Chennai |
ABM |
Data Center |
ETAP |
58 |
Shree Cements |
India |
Harmonics, VFD, Motor, PLC |
Shree Cements |
Shree Cements |
Process Industry |
N/A |
59 |
National Fertilizer Limited |
India |
Load flow, Short Circuit, Relay coordination, Unit Protection, Arc flash Studies, Transient Stability |
National Fertilizer |
TCE |
Process Industry |
ETAP |
60 |
Hetero Drugs Ltd |
India |
Arc Flash Studies |
HETROS LAB |
SAFEECO |
Pharmaceutical |
ETAP |
61 |
250 MW Solar Power Plant |
India |
Insulation Coordination, Harmonic measurement, Harmonic analysis |
SPRING Energy |
L&T ECC |
Solar |
ETAP, PSCAD |
62 |
Manpower Support for Engineering |
India |
Manpower Support for Engineering |
NORDEX |
NORDEX |
N/A |
N/A |
63 |
Orb energy Private Ltd |
Karnataka, India |
Relay Coordination, Unit Protection |
Orb energy |
Orb energy |
Solar |
ETAP |
64 |
Suguna Spong & power Private Ltd |
Thadipatri |
Load flow, Short Circuit Studies, Transient Stability,Harmonic Study, Relay Coordination Study |
Suguna Spong & power |
Suguna Spong & power |
Manufacturing |
ETAP 20.5 |
65 |
GAIL Petrotec Complex |
Auraiya,Uttat Pradesh |
Relay Coordination, Unit Protection |
GAIL |
TCE |
Petrochemicals and Refining |
ETAP 20.5 |
66 |
Supergas |
Tuticorin |
Short circuit and Realy co-ordination |
SHV Energy |
SHV Energy |
Oil & Gas |
ETAP 20.5 |
67 |
Addverb Technologies |
Noida |
Arc flash |
Addverb |
Addverb |
Manufacturing |
ETAP 20.5 |
68 |
Training on Solar Power Plant Design and Energy Estimation using PVsyst |
Thiruverkadu |
ETAP Training |
SA College |
SA College |
N/A |
ETAP 20.5 |
69 |
TREI |
VIZAG |
Arc Flash |
TREI |
TREI |
Manufacturing |
ETAP 20.5 |
70 |
Bill forge |
Bangalore |
Arc flash, LPS & Electrical Safety Audit |
RELTEC |
RELTEC |
Manufacturing |
ETAP 20.5 |
71 |
Laurus lab Ltd |
VIZAG |
Arc Flash |
Sri gayathri |
Sri gayathri |
Manufacturing |
ETAP 20.5 |
72 |
TITAN Manufacturing Plant |
Hosur |
Arc flash & LPS |
TITAN |
TITAN |
Manufacturing |
ETAP 20.5 |
73 |
BESS Optimization for 5 MW Solar Plant by using Homer Pro |
Chennai |
BESS Sizing |
AVANT GRADE |
AVANT GRADE |
Renewables |
Homerpro |
74 |
27.5MWp Solar Plant |
Karnataka |
LF,SC,RC |
Everrenew |
Everrenew |
Solar |
ETAP |
75 |
220/33kV IOCL Refinery |
Gujarat |
Insulation Co-ordination, Load flow, Short Circuit, Harmonic Analysis,Relay Cordination Report |
IOCL |
Siemens |
Oil and Gas |
PSCAD & ETAP |
76 |
Doosan Bobcat Private Ltd |
Chennai |
DG upgrade Feasiblity and HT cable routing |
Doosan Bobcat |
Power Projects |
Oil & Gas |
N/A |
77 |
Mahindra CIE Automotive Ltd, Plant IV |
Coimbatore |
Arc Flash Study & Electrical Safty Audit |
Mahindra CIE Ltd |
RELTEC |
Manufacturing |
ETAP |
78 |
Expansion of Existing 5MMTPA Capacity to 10MMTPA Capacity of Ennore LNG |
Ennore |
Load Flow, Short Circuit, Motor Starting |
IOLPL |
RINA |
Oil & Gas |
ETAP |
79 |
12 MW RDF Based WtE Power Plant |
Delhi, India |
Harmonic measrement RCA |
Indoenviro |
Indoenviro |
Manufacturing |
N/A |
80 |
Kreative Organic Private Ltd |
hyderabad, india |
Arc Flash |
Kreative Organic pvt. ltd |
Sri gayathri |
Manufacturing |
ETAP 20.5 |
81 |
Numaligarh Refiniery Ltd |
Assam, India |
Load Flow & Short Circuit Study Report Motor Starting Study Report Harmonics Study Report Transient Stability Study Report (Optional) Load Shedding Study Report (Optional) Relay coordination study Report \ |
Numaligarh Refinery Limited |
Tecnip / Tecton |
Manufacturing |
ETAP 20 |
82 |
ST Telemedia Global Data Centres |
Delhi, India |
Load Flow Report Short Circuit Report Relay coordination study Report |
ST TELEMEDIA GLOBAL DATA CNETRES |
Crescon projects and services Pvt. Ltd. |
Manufacturing |
ETAP 20 |
83 |
Training on Protection Relays |
Jaisalmer |
Training on Protection Relays |
Renew Power |
Renew Power |
Renewables |
ETAP |
84 |
3 MTPA Paste Fill Plant |
Madhya Pradesh |
Load Flow & Short Circuit Study Report Motor Starting Study Report Harmonics Study Report Relay coordination study Report |
Hindusthan Copper Ltd |
RDB Encon |
Minerals & Metals |
ETAP |
85 |
RA Chem Pharma Ltd |
Hydrabad |
Arc Flash Study |
Cohance |
Cohance |
Pharmaceutical |
ETAP 20 |
86 |
220/33kV wind farm pooling substation |
Kachchh Gujarat |
Insulation coordination |
– |
NS Engineers |
Power |
PSCAD |
87 |
Bill Forge Unit 3 |
Bangalore |
Arc flash Label Supply |
Mahindra CIE Automotive Limited |
Mahindra CIE Automotive Limited |
Manufacturing |
N/A |
88 |
230MW NTPC CPSU Solar Plant |
Tuticorin |
Harmonic Measurement |
NTPC |
L&T |
Solar |
N/A |
89 |
Aurobindo Pharma Ltd |
Hyderabad |
Arc flash studies |
M/s. Aurobindo Pharma |
Indus |
Manufacturing |
ETAP |
90 |
25MW AC Solar Power Plant |
Tamilnadu, India |
Relay Coordination, Unit Protection |
Acerenewtech |
Solar |
ETAP |
|
91 |
FGD of Thermal Power Plant |
India |
Load Flow, Short circuit, Motor starting Relay coordination, |
– |
TCE |
Power |
ETAP |
92 |
Coromandel International Ltd |
Andhra pradesh |
Load Flow, Short circuit, Motor starting Transienrt stablity Relay coordination, |
Coromandel |
Coromandel |
Minerals & Metals |
ETAP |
93 |
Lauras Labs Ltd |
Andhra pradesh |
Arc flash studies |
Lauras Lab |
Gayathri |
Pharmaceutical |
ETAP |
94 |
Iron ore handing and evacution system |
Odisha |
Relay Coordination |
Odisha Mining Corporation |
HOWE / TEED |
Minerals & Metals |
ETAP |
95 |
Training on Grid Compliance Studies using PSCAD and PSSE |
India |
Training on PSSe & PSCAD |
NTPC |
NTPC |
Corporate Training |
N/A |
96 |
220/33kV Reliance Life Science Substation |
India |
Insulation Coordination Study report (TOV, SFO, FFO) |
Reliance |
Siemens |
Power |
PSCAD |
97 |
Apraava Dedasari 250MW Soar Power Plant |
India |
Transformer OLTC Failure |
– |
Param renewables |
Solar |
N/A |
98 |
Quest ETAP Consultant Services |
Banaglore,India |
ETAP Consultant services |
– |
Quest Global |
Oil and Gas |
ETAP |
99 |
Training on Insulation Coordination studies using PSCAD |
Chennai, India |
Advacned PSCAD Training |
Hitachi |
Hitachi |
Corporate Training |
PSCAD |
100 |
Noida International Airport |
Uttar Pradesh,India |
Load Flow, Short Circuit, Motor Starting Relay coordiantion, Arc Falsh Insulation Cordination Traning on ETAP |
Noida Internationl Airport |
Tata Projects |
Airports |
ETAP / PSCAD |
101 |
SPV 50MW Ground Mounted solar Power Plant |
Bjilai,Chatttisgarh |
Relay coordination and validation |
Shresha RoofToop solar PV / Southeast central Railway |
Refex |
Solar |
ETAP |
102 |
Carboline India Private Limited Coatings and fireproofing |
Chennai, India |
Arc flash study |
Carboline |
Carboline |
Manufacturing |
ETAP |
103 |
Lucknow international airport |
Lucknow |
Load Flow, Short circuit |
Adani |
Egis India |
Airports |
ETAP |
104 |
726.6MW Combine Cycle Power Plant |
Thipura,India |
Feasibility Engineering |
ONGC Tripura Power Company Ltd |
ONGC Tripura Power Company Ltd |
Water |
AutoCAD |
105 |
Training on Insulation Coordination studies using PSCAD |
Bangalore, India |
Advanced PSCAD Training |
ABB |
ABB |
Corporate Training |
PSCAD |
106 |
Training on PSS tuning using PSSE |
Bangalore, India |
Advanced PSCAD Training |
ABB |
ABB |
Corporate Training |
PSCAD |
107 |
Honeywell Data Center |
Madurai, India |
Short circuit, Relay coordiantion, Arc Falsh |
Honeywell |
Honeywell,Madurai |
Data center |
ETAP |
108 |
Training on Power System Study using ETAP |
Durgapur,India |
ETAP Training |
Pinacle Infotech |
Corporate Training |
ETAP |
|
109 |
ISRO EHT/HT Power System |
India |
Short circuit, Relay coordiantion, Transformer Protection |
ISRO |
ISRO |
Power |
ETAP |
110 |
250MW Lignite Fired Power Plant |
India |
Arc Flash Study |
TAQA Neyveli Power Company Pvt, Ltd |
TAQA Neyveli Power Company Pvt, Ltd |
Power |
ETAP |
111 |
Engineering design for 180MW (100MWSolar + 80Wind) Hybrid Power Project |
India |
Short circuit, Relay coordiantion, AC ventililation sizing & Layout Fire Fighting Layout |
Everrenew |
Everrenew |
Solar |
ETAP |
112 |
Training on Power System Study using ETAP |
India |
ETAP Training |
RND Power Engineer |
RND Power Engineer |
Corporate Training |
ETAP |
113 |
Training on Power System Studies using Digsilent |
India |
Digsilent Training |
Ramboll India Pvt. Ltd |
Ramboll India Pvt. Ltd |
Corporate Training |
DigSILENT |
114 |
Technical Feasibility Study for Decentralise Energy Project |
India |
Load Flow, Short Circuit, Tramsient Stability Transformer Energisation Cable Energisation |
ChakrInnovation |
ChakrInnovation |
Process |
PSCAD |
115 |
CIE Hosur Limited |
India |
Arc Flash, Thermography Safety Audit LA Mapping |
CIE Hosur Limited |
CIE Hosur Limited |
Process |
ETAP |
116 |
PSCAD simulation Model / For Open Access Kamuthi Project |
India |
Reactive power compensation |
Enerparc Energy Private Limited |
Enerparc Energy Private Limited |
Solar |
PSCAD |
117 |
Training on Insulation Coordination Studies using PSCAD |
India |
PSCAD Training |
Kent |
Kent |
Corporate Training |
PSCAD |
118 |
Mahendra CIE Bill Forge Ltd |
Bangalore |
Lighting Protection Study |
Mahendra CIE Bill Forge |
Manunath Electricals |
Manufacturing |
– |
119 |
16 MVA Manufacturing Plant |
India |
Relay coordination |
Alcalab india Pvt Ltd |
Alcalab india Pvt Ltd |
Process |
ETAP |
120 |
Godavari Biorefineries LTd |
India |
Relay coordination |
Reltec |
Reltec |
Process |
ETAP |
121 |
Electrical System Study for 726 MW Combined Cycle Power plant |
India |
Electrical System Study |
ONGC Tripura Power Company Ltd |
ONGC Tripura Power Company Ltd |
Water |
ETAP |
122 |
Training on Lighting Control Design |
India |
Lighting control design Training |
Pinnacle infotech |
Pinacle Infotech |
Corporate Training |
ETAP |
123 |
Technical Feasibility Study for Decentralised Energy Project |
India |
Pre magnetizing Transformer Point on wave switching Synchronising 11kV |
ChakrInnovation |
ChakrInnovation |
Process |
PSCAD |
124 |
220kV GIS Substation for Manufacturing Unit of LI-ION Cell |
India |
Insulation Coordination Transformer Energisation Ferro Resonance Relay Coordination Unit Protection Cable Sizing LV Power and Control Cable Schedule Engineering |
Exide Battery |
Hitachi |
Manufacturing |
PSCAD |
125 |
180MW Solar Plant |
India |
Relay Coordination Study |
Adani |
Etricals Engineers Private Limited |
Solar |
ETAP |
126 |
Training on Power System Studies using ETAP |
India |
ETAP Training |
Toyo Engineering |
Toyo Engineering |
Oil and Gas |
ETAP |
127 |
IOLCP Plant |
Punjab, India |
Arc Flash |
IOLCP |
IOLCP |
Manufacturing |
ETAP |
128 |
Changdad Substation |
India |
Relay coordination |
Olam agro |
Reltec |
Infrastructures |
ETAP |
129 |
70MW Solar Plant |
UP, India |
Load Flow |
Fourth Partner |
Fourth Partner |
Solar |
ETAP |
130 |
Training on Power System Study using ETAP |
India |
ETAP Training |
Tanezco & Kalpataru power |
RND Power Engineer |
Corporate Training |
ETAP |
131 |
38MW Solar Plant |
Tamilnadu, India |
Root cause analysis |
First Energy |
Everrenew |
Solar |
ETAP |
132 |
Porus Laboratories Units – Atchutapuram and Parwada |
Visakhapatnam,India |
Arc flash |
Porus Labs |
Porus Labs |
Pharmaceutical |
ETAP |
133 |
Training on Insulation Coordination study using PSCAD |
Ahemadabad |
PSCAD Training |
Adani |
Adani |
Corporate Training |
PSCAD |
134 |
Hertz Electricals – Schaeffler |
Hosur, India |
Arc Flash |
Schaffler |
Hertz Electricals |
Manufacturing |
ETAP |
135 |
300MW Solar plant |
Bikaner, India |
Harmonic Measurement and Analysis |
Enel |
Enel |
Solar |
ETAP |
136 |
Teleflex Private Limited |
Puducherry |
Arc Flash |
Teleflex |
Teleflex |
Manufacturing |
ETAP |
137 |
2 MW Solar Plant |
Maharastra, India |
Short circuit, Relay coordination, Arc Flash |
Total Energy |
Total Energy |
Solar |
ETAP |
138 |
Kemin Industries South Asia Pvt.Ltd |
Chennai, India |
Arc Flash Study |
Kemin |
Kemin |
Substation |
ETAP |
139 |
90MW Anta Solar Power Plant |
Rajasthan, India |
LF,SC,RC |
NTPC |
Amararaja |
Solar |
ETAP |
140 |
Training on Detail Engineering |
Hyderabad, India |
DE Training |
Amararaja |
Amararaja |
Substation |
Excel |
141 |
Crystal Industrial Park B-400 Bhayla (COCA-COLA WAREHOUSE) |
Ahmedabad, India |
Arc Flash Study |
FABS Management Services PTE Ltd. |
FABS Management Services PTE Ltd. |
Process |
ETAP |
142 |
Training on Power Quality using PSCAD |
Bangalore, India |
PSCAD Training |
InPhase Power Technologies Private Limited |
InPhase Power Technologies Private Limited |
Substation |
PSCAD |
143 |
220kV GIS Data Center |
Mumbai, India |
Insulation Coordination Study |
Power Engineers |
Power Engineers |
Data center |
PSCAD |
144 |
Hertz Electricals – Schaeffler |
Hosur, India |
Arc Flash |
Hertz Electricals |
Manufacturing |
ETAP |
|
145 |
Enel |
Bikaner, India |
Harmonic Measurement and Analysis |
Enel |
Solar |
ETAP |
|
146 |
Teleflex Private Limited |
Puducherry |
Arc Flash |
Teleflex |
Manufacturing |
ETAP |
|
147 |
2 MVA Solar Plant, Maharastra |
Maharastra, India |
Short circuit, Relay coordination, Arc Flash |
Total Energy |
Solar |
ETAP |
|
148 |
Frajafail – 420 / 300 / 132 kV Substation |
Ireland |
Insulation Coordination |
Substation Engineers |
Electric Utilities |
PSCAD |
|
149 |
6.5MW Solar Plant + BESS + 5.5MW Electrolyser |
gujarat ,india |
Load Flow, Short circuit, Transient Stability |
Replus |
Replus |
fuel cell |
DigSILENT |
150 |
100MW (39MW Wind+60MW Solar) Hybrid Power Project |
tamil nadu,india |
Line Loss study |
– |
Everrenew |
Solar |
ETAP |
151 |
2.81MWp Solar+369kWh/738kW BESS+1.69MW Electrolyser Green Hydrogen Plant |
Madhya pradesh |
DC Load flow Short Circuit study report Stability Study Report |
Hygenco |
Hygenco |
fuel cell |
DigSILENT |
152 |
220/33kV Substation |
Odisha,india |
Insulation Coordination |
Tata Steel |
Siemens |
Manufacturing |
PSCAD & ETAP |
153 |
NMDC |
Rourkela India |
Load Flow Studies Short Circuit Studies |
NMDC |
VADIM Infrastructure (VIPL) |
Process Industry |
ETAP 19.5 |
ASIA COUNTRIES
UAE |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
ADDC |
Abu Dhabi |
Load Flow, Short Circuit, Motor Starting, Harmonic Analysis, Protection setting calculation in LV & MV |
ABU DHABI TRANSMISSION & DESPATCH COMPANY |
DANWAY-ELECTRICAL |
Power |
ETAP |
2 |
33 kV Switchgear |
UAE |
CT Sizing Low Impedance Busbar Differential Protection |
ACUME |
ACUME |
Manufacturing |
Excel |
3 |
400V DG Load Sharing and Load shedding |
UAE |
Load flow, Short Circuit, Motor starting, Harmonics, Transient Stability |
GKPI |
Exidasp |
Oil & Gas |
ETAP |
4 |
FAIR & AQAH Substation |
UAE |
Relay coordination |
– |
KESTREL |
Power |
ETAP |
5 |
Dubai International Airport |
UAE |
Corodination study |
Etisalat |
DULAND TECHNICAL SERVICES LLC |
Airports |
ETAP |
6 |
Training on Power System Studies using ETAP |
UAE |
ETAP Training |
Dragon oil |
Dragon oil |
Corporate Training |
ETAP |
IRAQ |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
KURDISTAN PIPELINE COMPANY PTE LTD. |
IRAQ |
Protection co-ordination |
KPC |
Exidasp |
Oil & Gas |
ETAP |
2 |
KURDISTAN PIPELINE COMPANY PTE LTD |
Iraq |
Load flow, Short circuit, Motor acceleration study, Harmonic Analysis, RAM study & Transient Overvoltage Study |
KPC |
EXIDASP |
Oil & Gas |
ETAP |
3 |
Feasibility Study for Back up power for DGS N |
Iraq |
Engineering services |
ZPOD |
KSS energy consultants / ARD |
Oil & Gas |
N/A |
4 |
Zubair oil field |
Iraq |
Load Flow, Short Circuit, Motor Starting, Relay coordination |
ZPOD |
KSS energy consultants / ARD |
Oil & Gas |
ETAP |
5 |
Replacement of 33kV Underground cables in DGS-N to H Area |
Iraq |
Cable Replacment Engineering works |
ZPOD |
KSS energy consultants / ARD |
Oil & Gas |
ETAP |
6 |
Wells Lighting Installation |
Iraq |
Lighting Design |
ZPOD |
KSS energy consultants |
Manufacturing |
Dialux |
7 |
Back up Power Supply to DGS N – Supply of containerized substation for SS-01 & 02 |
Iraq |
Package Substation Engineering for LLI items |
ZPOD |
KSS energy consultants |
Oil and Gas |
AutoCAD,ETAP |
8 |
ZUBAIR DGS – Electrical LV Load Separation |
Iraq |
Engineering service for new package substation |
ZPOD |
KSS energy consultants |
Oil and Gas |
AutoCAD,ETAP |
9 |
DGS-N all 33kV, 11kV, 6kV & 0.4kV Switchgears |
Iraq |
Load Flow, Short Circuit, Motor Starting Harmonic Study Relay coordiantion, |
ZPOD |
KSS energy consultants |
Oil and Gas |
ETAP |
10 |
ZUBAIR DGS – Provision of Ventilation Systems in DGS-N |
Iraq |
Enginering Services |
ZPOD |
KSS energy consultants |
Oil and Gas |
ETAP |
11 |
KSS Wells Electrification |
Iraq |
Load flow, short circuit, Relay coordination |
KSS |
KSS |
Substaton |
ETAP |
12 |
DGS N Substation Instrumentation Work |
Iraq |
Fire and gas system |
KSS |
KSS |
Substaton |
ETAP |
13 |
132kV GIS Substation |
Iraq |
Pre Bid Engineering Support |
KSS |
KSS |
Substaton |
ETAP |
14 |
MOD Fast track project |
Iraq |
Load flow, short circuit, Relay coordination |
KSS |
KSS |
Substaton |
ETAP |
15 |
MOD Fast track project |
Iraq |
Load flow, short circuit, Relay coordination |
KSS |
Substaton |
ETAP |
|
SAUDI |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Pepsi Food Production Plant |
Dammam – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 14 |
2 |
Pepsi Food Production Plant |
Jeddah – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 14 |
3 |
Pepsi Food Production Plant |
Riyadh – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 14 |
4 |
DUBA Combine Cycle Power Plant |
Saudi Arabia |
Arc Flash Studies |
Saudi Electric Company |
ModPro Engineers |
Power |
ETAP 14.1 |
5 |
SA-2 Extension |
Kingdom of Saudi Arabia |
Short Circuit Studies Motor Starting Studies Relay Coordination CT Sizing Earthing Studies |
Nutek |
Nutek |
Process Industry |
ETAP 14.1 |
6 |
BUWAIB Water treatment |
Riyadh, Kingdom of Saudi Arabia |
Load Flow Studies Short Circuit Studies Relay Coordination Arc Flash Studies Insulation Coordination |
Madhura Consultants |
– |
Water Treatment |
ETAP 14.1 |
7 |
KAPSARC |
Saudi Arabia |
Short Circuit Studies Relay Coordination |
Synergy – Saudi Arabia |
Pothigai Power Systems |
Process Industry |
ETAP 14 |
8 |
Dammam Airport |
Saudi Arabia |
Short Circuit Studies Relay Coordination |
Synergy |
Pothigai Power Systems |
Airports |
ETAP 16 |
9 |
Biolab – Train 1 Expansion |
Saudi Arabia |
Load Flow studies Short Circuit Studies Relay Coordination Arc Flash Studies |
Biolab |
MRM |
Process Industry |
ETAP 19 |
10 |
Baby Whipes |
Saudi Arabia |
Load Flow studies Short Circuit Studies Relay Coordination |
Synergy |
Pothigai Power Systems |
Process Industry |
ETAP 19 |
11 |
Arabian Petrochemical Company, Al-Jubail |
Saudi Arabia |
Short Circuit Studies Relay Coordination |
Madhura Consultants |
Ingenious Network India Private Limited |
Process Industry |
ETAP 19 |
12 |
KFIA Damman Airport |
Saudi Arabia |
Load Flow studies Short Circuit Studies Relay Coordination |
Synergy |
Pothigai Power Systems |
Airports |
ETAP 19 |
13 |
Pepsi Food Production Plant |
Jeddah – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 19 |
14 |
Pepsi Food Production Plant |
Riyadh – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 19 |
15 |
SFSF |
Saudi Arabia |
Short Circuit Studies Relay Coordination Arc Flash Studies |
ABB Saudi |
KESTREL |
Process Industry |
ETAP 19.5 |
16 |
Almarai 40 MW Diesel Power plant |
Saudi Arabia |
Relay Coordination |
Pothigai Power Systems |
Power |
ETAP 19.5 |
|
17 |
Saline water conversion corporation, water treatment plant |
Saudi Arabia |
Short Circuit Studies, Relay Coordination Studies |
Pothigai Power |
Pothigai Power |
Process Industry |
ETAP 19.5 |
18 |
Abu ghonema mountain tanks |
Saudi Arabia |
Short Circuit Studies, Relay Coordination Studies |
Pothigai Power |
Pothigai Power |
Process Industry |
ETAP 19.5 |
19 |
Coca Cola Production Plant |
Saudi Arabia |
Short Circuit Studies, Relay Coordination Studies |
Pothigai Power |
Pothigai Power |
Process Industry |
ETAP 19.5 |
20 |
New Naval Base Project |
Saudi Arabia |
Short Circuit Studies, Relay Coordination, Unit Protection |
ABB Saudi |
KESTREL |
Process Industry |
ETAP 19.5 |
21 |
GOSP4 115 kV Substation |
Saudi Arabia |
Insulation Coordination |
GE |
Ingenious Network FZC, UAE |
Electric Utilities |
PSCAD |
22 |
ZULUF 230 kV Substation |
Saudi Arabia |
Insulation Coordination |
GE |
Ingenious Network FZC, UAE |
Electric Utilities |
PSCAD |
23 |
VOPAK |
Saudi Arabia |
Short Circuit Studies and Relay Coordination Study |
KESTREL |
KESTREL |
Process Industry |
ETAP 20.0 |
24 |
Protection Coordination |
Saudi Arabia |
Relay Coordination |
Ingenious |
Ingenious |
Process Industry |
ETAP 20.0 |
25 |
Q Terminal |
Saudi Arabia |
Relay Coordination |
KESTREL |
KESTREL |
Process Industry |
ETAP 20.0 |
26 |
40 Feeder Project |
Saudi Arabia |
Short Circuit Study & Protection co-ordination |
Synergy |
Synergy |
Oil & Gas |
ETAP |
27 |
300 MW Rabigh Solar Power Plant |
Saudi Arabia |
Review Engineering |
Saudi Electric Company |
China enegy Engineering Coorporation |
Solar |
N/A |
28 |
Jeddah Airport |
Saudi Arabia |
Load flow, Short circuit, Motor acceleration studies, Relay Coordination, Arc flash studies, Harmonic Analysis |
Jeddah Althaniya Water Company (JAWC) |
Saudi Services for Electro Mechanic Works Co. (SSEM) |
Airports |
ETAP |
29 |
APOC PDH – UTOS 220 kV GIS Substation |
Saudi Arabia |
Insulation co-ordination |
GE |
Ingenious |
Power |
PSCAD |
30 |
1500 MW Sudiar Solar Power Plant |
Saudi Arabia |
Relay coordination, Unit Protection, AC & DC Arc flash studies |
L&T ECC |
L&T ECC |
Solar |
ETAP |
31 |
Fujarah Airport |
Saudi Arabia |
Relay Coordination |
KESTREL |
Airports |
ETAP |
|
32 |
NEOM – 1650 MW Wind, 2400 MW Solar, 400 MW Battery |
Saudi Arabia |
Reactive Power Compensation, Input Preparation |
Air Products |
L&T ECC |
Solar |
ETAP |
33 |
Al Mostawi Reservoir |
Saudi Arabia |
Relay Coordination |
MEWA |
SSEM |
Water Treatment |
ETAP |
34 |
SAAD IPP 300MW Solar Power Plant |
Saudi Arabia |
Insulation Coordination Study report (TOV, SFO, FFO) |
Saudi power procurment company/ Al Ghazala Energy Company |
Elesewedy Electric / Suggr Energy |
Solar |
PSCAD |
35 |
Shoaiba-Quaiza B Water Transmission System |
Jeddah,Saudi |
Detailed Engineering |
Water Transmission and Technologies Co. |
SASEC Engineering |
Water |
N/A |
36 |
Cable Ampacity |
saudi |
Cable Ampacity |
Kestrel |
KESTREL |
Substation |
ETAP |
QATAR |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Doha Mall |
Qatar |
Harmonic Study |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Infrastructures |
ETAP 16 |
2 |
Omega CS_1805020 |
Qatar |
Load flow studies Short Circuit Studies Relay Coordination Arc Flash Studies |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Process Industry |
ETAP 18 |
3 |
Abu Hamour Mall |
Qatar |
Short Circuit Studies Relay Coordination |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Infrastructures |
ETAP 19 |
4 |
CP5 |
Qatar |
Short Circuit Studies Relay Coordination |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Process Industry |
ETAP 19 |
5 |
Al Rayan Stadium |
Qatar |
Short Circuit Studies Relay Coordination |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Infrastructures |
ETAP 19 |
6 |
Hamad International Airport |
Qatar |
Short Circuit Studies, Relay Coordination Study and Arc Flash Study |
Winstar Electromechanical Qatar |
Winstar Electromechanical |
Airports |
ETAP 20.0 |
7 |
11 kV Switchgear Retrofit |
Qatar |
Relay Coordination Study |
Winstar Electromechanical Qatar |
Winstar Electromechanical |
Process Industry |
ETAP 20.0 |
8 |
AL BARAHA Super 1 GIS – 400/220 kV |
Qatar |
Insulation co-ordination study |
L&T ECC |
L&T ECC |
Power |
PSCAD |
9 |
New port Qatar Airport |
Qatar |
Protection co-ordination |
ABB |
Kestral |
Airports |
ETAP |
10 |
11 kV Switchgear Modification |
Qatar |
Load flow, Short circuit and Relay co-ordination |
Winstar Electromechanical Qatar |
WINSTAR |
Oil & Gas |
ETAP |
11 |
Qatar Gas Operating Company Ltd |
Qatar |
Relay Coordination |
Petrotec |
Petrotec |
Manufacturing |
ETAP |
12 |
Qatar gas Operating Company Ltd |
Qatar |
Relay Coordination |
Winstar Electromechanical Qatar |
WINSTAR |
Manufacturing |
ETAP |
13 |
Hamad International Airport – 5 Substation Expansions |
Qatar |
Load flow, Short Circuit Studies, Relay Coordination Study and Arc Flash Study |
Winstar Electromechanical Qatar |
Winstar Electromechanical |
Manufacturing |
ETAP 20.5 |
14 |
Qatar Company for Airports Operation and Management |
Qatar |
RC |
Winstar |
Power |
ETAP 20.5 |
|
15 |
Hamad International Airport – CSN & CSE Expansions |
Qatar |
Unit Protection |
Winstar |
Power |
ETAP 20.5 |
|
16 |
Hamad International Airport – Non Essential and Essential Supply Compact Substation |
Qatar |
RC |
Winstar |
Power |
ETAP 20.5 |
|
17 |
Qatar Gas |
Qatar |
Short circuit and Relay Coordination |
Qatar Gas Operating Company Ltd. |
Winstar LLC |
Oil & Gas |
ETAP |
18 |
Root Cause analysis for 800.215MWp Al Kharsaa Solar power |
Qatar |
Root cause analysis for power dip for the solar palnt |
Siraj 1 |
Power China |
Renewables |
ETAP 20 PSCAD |
19 |
Quantum Switch Data Center |
Qatar |
Load flow. Short circuit, Relay coordiantion, Arc Falsh |
Q DATA / Quantum Switch |
Winstar LLC |
Data center |
ETAP |
20 |
800.215MWp Al Kharsaa Solar Power Plant |
Qatar |
Energy Flow & Power Impact studies to analyze the losses and low performance of the Al Kharsaa PV |
Siraj 1 |
Power China |
Solar |
ETAP |
21 |
HALUL & NFA Complex |
Qatar |
Load flow, short circuit, Relay coordination |
Qatar Energy |
Converse Technologies |
Infrastructures |
ETAP |
22 |
20BMA01 Switchgear (18nos of feeder) |
Qatar |
RC |
Soofi |
soofi |
Oil and Gas |
ETAP |
23 |
NFE1 QG Camp |
Qatar |
LF,SC,RC |
Qatar Gas company |
Petrotec |
Substaton |
ETAP |
24 |
Doha Mall |
Qatar |
LF,SC,RC |
Petrotec |
Substaton |
ETAP |
|
dubai |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Stevin Rock/ Rak Rock Switching station |
Dubai |
Short circuit and Realy co-ordination |
Kestrel |
Kestrel |
Power |
ETAP |
2 |
22/0.415kV Data Centre Plant |
Dubai |
Short Circuit, Relay Coordination, Arc Flash |
Mega power |
Mega power |
Data center |
ETAP |
3 |
Cable interconnection diagram |
Dubai |
Cable interconnection diagram |
ADNOC |
– |
Oil and Gas |
ETAP |
4 |
Khazna Data Center |
Dubai |
Relay Coordination |
Khazana |
AASA Group |
Data center |
ETAP |
INDONESIA |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
ABB ID |
Indonesia |
Relay Coordination |
Jatim Steel |
ABB |
Manufacturing |
ETAP |
JORDAN |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Insulation Coordination Study for 66kV D/C TL |
Jordan |
Insulation Coordination |
Theji Constructions Pvt Ltd |
Theji Constructions Pvt Ltd |
Electric Utilities |
PSCAD |
2 |
Arc Flash Study for APZ Zarqa and AP Risha Solar Plant |
Jordan |
Arc Flash Study |
ACWA |
Khalid |
Solar |
ETAP |
KWAIT |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
1500 MW Al Dibdida Solar Plant – Kuwait |
Kuwait |
Load Flow studies Short Circuit Studies Harmonic Analysis |
L&T ECC |
L&T ECC |
Solar |
ETAP 19 DigSILENT |
2 |
South Ahamdi – Construction of New House |
Kuwait |
Short Circuit Study & Protection co-ordination |
KOC |
HEISCO |
Oil & Gas |
ETAP |
OMAN |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Ritaj Consultants |
Muscat Oman |
Ritaj Engineers and Consultants |
Ritaj Engineers and Consultants |
Power |
DigSILENT |
|
2 |
AL-Shabbagh |
Oman |
Short circuit & Harmonics analysis |
AL-Shabbagh |
AL-Shabbagh |
Oil & Gas |
ETAP |
3 |
Oman National Grid |
Oman |
ETAP to DIgSILENT Conversion |
Hesman |
Hesman |
Process Industry |
DIsILENT |
4 |
Annual Energy Yield Assessment of the Grid Connected Solar Plant |
Oman |
PV SYST |
HES |
HES |
Renewables |
PV syst |
5 |
AD Dhakhiliyah water transmission system |
Oman |
Relay Coordination Study |
DIAM |
L&T |
Water Treatment |
ETAP |
6 |
33/11kV Cement plant |
Oman |
Load flow & Contingency Study Short circuit study Harmonic system study Protection coordination study Transient study Grid Islanding & Load shedding study |
– |
HES |
Manufacturing |
DigSILENT |
7 |
Manpower Support |
Oman |
Manpower Support for Engineering |
– |
HES |
Manufacturing |
ETAP 20 |
8 |
Training on substation Design Engineering |
Oman |
Detailed Engineering Training |
DEC |
DEC |
Process |
Excel |
RUSSIA |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
AVR STability Studies TCE |
Russia |
Transient Stability |
Tashkent HPP |
TCE |
Power |
ETAP 20 |
vietnam |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
26 MW Hydro Plant |
Vietnam |
Short circuit analysis |
BFL |
BFL |
power |
ETAP |
BANGALADESH |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Hero Production |
Niloy – Bangladesh |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
Hero MotoCorp |
ModPro Engineers |
Process Industry |
ETAP 14.1 |
AFRICA COUNTRIES
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Power System Studies for integration of WTG & BESS with FPSO |
Brazil |
LF,SC,TS, BESS |
BW offshore |
ABB SG |
Offshore |
ETAP / DigSILENT |
COMBODIA |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
CEL – I & II Plant, Cambodia |
cambodia |
Lightning, Relay coordination, Earthing, Insulation Coordination |
Combodia Energy Limited |
Leader Energy |
Power |
– |
CHAD |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Petrochad |
Chad |
Load Flow studies Short Circuit Studies Relay Coordination |
Petrochad |
Network India Priva |
Process Industry |
ETAP 19 |
DIJIBOUTI |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Avant Garde |
DIJIBOUTI |
optimization of pv and battery |
Avant Garde |
Avant Garde |
Solar |
Homer pro |
ghana |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Arc flash study newmont, Tesla Ghana |
Ghana |
Arc flahs study |
Teslaghana |
Teslaghana |
Manufacturing |
ETAP |
IVORY COAST |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Port – IVORY COAST |
IVORY COAST |
Load Flow, SHort Circuit, Motor Starting, Relay Coordination |
RINA |
RINA |
Process Industry |
ETAP 20.0 |
KENYA |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
ISINYA 220kV Substation |
Kenya |
Trp Matrix, InterConnection Diagram Interlock Diagram, Protection Schemes |
NCC |
Nissi Engineering |
Electric Utilities |
N/A |
2 |
Savannah Cement Plant |
Kenya |
Short Cicuit Studies Relay Coordination Studies |
Flsmith |
ModPro Engineers |
Process Industry |
ETAP 19 |
SENEGAL |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
30 MW PV plus Energy Storage |
Senegal |
BESS Optimisation |
Avant-garde |
Avant-garde |
Microgrid and Energy Storage |
HOMER |
Sierra Leone |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Grid Impact Study |
Sierra Leone |
Grid Impact Study ( i. Short Circuit Study ii. Power Quality Study (Harmonic Disturbance, Flicker) iii. Grid Compliance Analysis comply with Grid Code iv. Active Power Control v. Frequency Response Analysis vi. Reactive Power Support ) |
Thiraipuram |
Thiraipuram |
Electric Utilities |
ETAP 19.5 |
EUROPE COUNTRIES
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
22 kV Substation and RMU |
Ethiopia |
Short circuit analysis |
IMEX |
IMEX |
Power |
ETAP |
GERMAN |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Fluence, 2*100MW BESS Grid booster project |
German |
PSS |
– |
Fluence |
BESS |
DigSILENT |
IRELAND |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
FRA 54.3 Data Center |
Ireland |
Load Flow Studies Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
H&MV Engineers |
Substation Engineers |
Data Center |
ETAP 14.1 |
2 |
FRA 54.4 Data Center |
Ireland |
Relay Coordination Studies |
H&MV Engineers |
Substation Engineers |
Data Center |
ETAP 14.1 |
3 |
Garvagh 38kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Wind |
PSCAD |
4 |
Carickallen 38kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Wind |
PSCAD |
5 |
DUBIN Gas Power Plant |
Ireland |
Load Flow Studies Short Cicuit Studies Transient Stability Studies Transformer Energisation Studies Earthing Studies |
H&MV Engineers |
Substation Engineers |
Power |
ETAP 14.1 |
6 |
Magheramore 38kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Wind |
PSCAD |
7 |
ESB & ESK 110/38kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Wind |
PSCAD |
8 |
Frajafail – 420 / 300 /132 kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Electric Utilities |
PSCAD |
9 |
110/38kV Substation |
Ireland |
Insulation Coordination |
Substation Engineers |
Substation Engineers |
Electric Utilities |
PSCAD |
10 |
110/38 kV Rosspile /Gillinstown |
Ireland |
Insulation co-ordination study |
H&MV Engineers |
Substation Engineers |
Power |
PSCAD |
11 |
110/38 kV Rosspile /Gillinstown |
Ireland |
Insulation co-ordination study |
H&MV Engineers |
H&MV |
Power |
PSCAD |
SERBIA |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Serbia Detail design- Traction Power |
Serbia |
serbia |
DB |
Serbia Detail design- Traction Power |
Rail |
N/A |
KURDISTAN |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
11kV 2.7MVA GARMIAN BLOCK |
Kurdistan |
Load Flow, Short circuit, Relay coordination, |
Ministry of Iraq |
Exisdasp |
Oil & Gas |
ETAP |
NORWAY |
|||||||
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Battery Energy Storage System Rating – Power System Study – BESS and Wind Turbine Generator for Electrification of Brage Platform |
Norway |
– |
– |
ABB |
Offshore |
Homerpro |
UK
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Port of Tyne, NewCastle BESS |
UK |
Short circuit studies, Protection Coordination Studies |
RES |
EPS |
BESS |
ETAP/ DigSILENT |
2 |
Harmonic Analysis for Solar Plant – Staveley & Basildon |
UK |
Harmonic Analysis |
Midrula |
Midrula |
Solar |
DigSILENT |
3 |
132/11kV Hemel Data Center |
UK |
Load Flow, Short circuit, Relay coordination, |
Midrula |
Midrula |
Data center |
DigSILENT |
4 |
LHR095H Data Center |
UK |
Load Flow, Short circuit, Relay coordination, |
Midrula |
Midrula |
Data center |
DigSILENT |
5 |
SHP 33/11kV X-Ray Primary Substation |
UK |
Relay Coordination |
– |
Asa Bhanu |
Power |
DigSILENT |
6 |
Hemel Data Center |
UK |
Transformer Energisation Study |
Midrula |
Midrula |
Data center |
DigSILENT |
7 |
DNO Steveley solar power Plant, UK |
UK |
P28 Study |
Midrula |
Midrula |
Solar |
DigSILENT |
8 |
Chandos Data center |
UK |
Load Flow, Short Circuit |
Midrula |
Midrula |
Data center |
DigSILENT |
9 |
DNO Braintree Solar Power Plant |
UK |
Harmonic Analysis |
Midrula |
Midrula |
Solar |
DigSILENT |
10 |
DNO Braintree Solar Power Plant |
UK |
P28 Study |
Midrula |
Midrula |
Solar |
DigSILENT |
11 |
DNO Basildon Solar Power Plant |
UK |
P28 Study |
Midrula |
Midrula |
Solar |
DigSILENT |
12 |
DNO Braintree Solar Power Plant |
UK |
G99 Study |
Midrula |
Midrula |
Solar |
DigSILENT |
13 |
DNO Basildon Solar Power Plant |
UK |
G99 Study |
Midrula |
Midrula |
Solar |
DigSILENT |
14 |
DNO Staveley Solar Power Plant |
UK |
G99 Study |
Midrula |
Midrula |
Solar |
DigSILENT |
15 |
DNO Alliance Park Solar Power Plant |
UK |
G5/4 |
Midrula |
Midrula |
Solar |
DigSILENT |
16 |
30MW Braintree, Staveley, Basildon Solar Plant |
UK |
Lightning Risk Assesment |
Midrula |
Midrula |
Solar |
Excel |
17 |
LHR095H Data Centre |
UK |
Harmonic Analysis |
Mirdula |
Mirdula |
Data center |
DigSILENT |
UZBEKISTAN
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
200 MW Solar Power Plant |
Uzbekistan |
Reactive Power Compensation, Input Preparation |
MASDAR |
UZASSYSTEM |
Solar |
ETAP |
2 |
220/35kV 100MW Nukus Wind Power Plant |
Uzbekistan |
CT/VT Calculation |
Uzassystem |
Uzassystem |
Wind |
Excel |
3 |
230 MW and 240MW Solar Plant |
Uzbekistan |
Relay Coordination |
Uzasystem |
Solar |
DigSILENT |
|
4 |
Secondary Design Engineering for 100MW WindPlant |
Uzbekistan |
DE |
Nukus |
Uzasystem |
Wind |
– |
USA
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
25 MW Solar and Battery Energy System |
USA |
Homer pro 25 MW AC Solar power plant |
– |
Avant Garde |
BESS |
Homer Pro |
2 |
30MW Solar Power Plant |
USA |
Load flow Short Circuit |
KEENTEL |
KEENTEL |
Solar |
ETAP |
3 |
5MW Solar Power Plant |
USA |
Inverter settings |
MG Consultant |
MG Consultant |
Solar |
N/A |
4 |
220MW Solar Plant & BESS |
USA |
Feasible |
Avant Garde |
Avant Garde |
Renewables |
PVSYST/Homer |
5 |
Solar Plant Engineering Review |
USA |
Review Engineering |
Keentel |
Keentel |
Solar |
N/A |
6 |
Pyramid Lake microgrid project |
USA |
Load Flow, Short circuit, Grounding, Relay coordination, ArcFlash |
Maxwell faraday |
Maxwell faraday |
Microgrid |
ETAP |
7 |
Vermilton Rise 185MW Solar Power Plant |
USA |
Load flow. Short circuit, Cable ampacity, Energy loss study |
Axial Energy |
Ace Renewtech |
Solar |
ETAP |
8 |
Burnt Peak microgrid project |
USA |
Load Flow, Short circuit, Grounding, Relay coordination, ArcFlash |
Maxwell faraday |
Maxwell faraday |
Microgrid |
ETAP |
9 |
Vermilton Rise 185MW Solar Farm |
USA |
Load flow. Short circuit, Cable ampacity, Energy loss study |
Ace Renewtech |
Solar |
ETAP |
|
10 |
Burnt Peak microgrid project |
USA |
Load Flow, Short circuit, Grounding, Relay coordination, ArcFlash |
Maxwell faraday |
Microgrid |
ETAP |
|
11 |
5 MW Solar Power Plant |
New York,USA |
Load flow, Short circuit, Motor Starting, Relay co-ordination, Arc flash |
MG CONSULTANT |
MG CONSULTANT |
Solar |
N/A |
12 |
15 MW Solar Power Plant |
New York,USA |
Load flow Studies – Reactive Power Compensation studies |
MG CONSULTANT |
MG CONSULTANT |
Solar |
ETAP |
SINGAPORE
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
2 * 72 MW Waste heat Power Plant |
Singapore |
Load Flow, Short Circuit, Motor Starting, Transient Stability, Relay Coordination, Harmonic Analysis |
ABB Singapore |
ABB Singapore |
Power |
ETAP 20.0 |
Manpower Support for Engineering |
Singapre |
Manpower Support for Engineering |
Nexvision power & Automation |
Nexvision power & Automation |
Power |
N/A |
Manpower Support for Engineering |
Singapre |
Manpower Support for Engineering |
Nexvision power & Automation |
Nexvision power & Automation |
Water Treatment |
N/A |
OPEN CYCLE GAS TURBINE GENERATING STATION- STAGE 1A |
Singapore |
Insulation Coordination Study for (PSCAD) 400kV GIS ▪ Temporary Over Voltage ▪ Slow Front Overvoltage ▪ Fast Front Overvoltage • Transformer Energization Study • PSS Voltage Regulator Stability Study • Transient Stability Study |
– |
YD |
Power |
PSCAD / ETAP / Matlab |
Keppel Sakra Cogen 600MW Advanced Gas Turbine Cogeneration Combined Cycle Plant |
Singapore |
Insulation Coordination Study for (PSCAD) 400kV GIS ▪ Temporary Over Voltage ▪ Slow Front Overvoltage ▪ Fast Front Overvoltage • Transformer Energization Study • PSS Voltage Regulator Stability Study • Transient Stability Study |
– |
YD |
Power |
PSCAD / ETAP / Matlab |
Plate mill Revamp |
Singapore |
Load Flow, Short Circuit, Relay coordination, |
ABB SG |
ABB SG |
Process |
ETAP |
Banyan CCP4 Project |
Singapore |
Insulation Coordination Study for (PSCAD) 400kV GIS ▪ Temporary Over Voltage ▪ Slow Front Overvoltage ▪ Fast Front Overvoltage • Transformer Energization Study • PSS Voltage Regulator Stability Study • Transient Stability Study |
Sembcorp |
YD Consulting |
Power |
PSCAD / ETAP / Matlab |
SRILANKA
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
YD PSCAD Training |
Srilanka |
PSCAD Training |
YD |
YD |
Corporate Training |
PSCAD |
SOFTWARES
ETAP
Sl.No |
Project |
Location |
Scope |
End Customer |
Contractor / Consultant |
Sector |
Software |
1 |
Tasek Cement Plant |
Malaysia |
Load Flow Studies Short Circuit Studies Motor Starting Studies Transient Stability Studies Harmonic Analysis Relay Coordination |
Tasek Bhd |
RS Consultants |
Process Industry |
ETAP 14 |
2 |
Pepsi Food Production Plant |
Dammam – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 14 |
3 |
Pepsi Food Production Plant |
Jeddah – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 14 |
4 |
Pepsi Food Production Plant |
Riyadh – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 14 |
5 |
Hero R&D and Production |
Kukas Jaipur Rajasthan – India |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
Hero MotoCorp |
ModPro Engineers |
Process Industry |
ETAP 14.1 |
6 |
Hero Production |
Gujarath – India |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
Hero MotoCorp |
ModPro Engineers |
Process Industry |
ETAP 14.1 |
7 |
Hero Production |
Niloy – Bangladesh |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
Hero MotoCorp |
ModPro Engineers |
Process Industry |
ETAP 14.1 |
8 |
DUBA Combine Cycle Power Plant |
Saudi Arabia |
Arc Flash Studies |
Saudi Electric Company |
ModPro Engineers |
Power |
ETAP 14.1 |
9 |
FRA 54.3 Data Center |
Ireland |
Load Flow Studies Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
H&MV Engineers |
Substation Engineers |
Data Center |
ETAP 14.1 |
10 |
FRA 54.4 Data Center |
Ireland |
Relay Coordination Studies |
H&MV Engineers |
Substation Engineers |
Data Center |
ETAP 14.1 |
11 |
2 * 660MW Thermal Power Plant TPCIL |
Nellore, India |
Relay Coordination Studies |
SempCorp |
Nissi Engineering |
Power |
ETAP 14.1 |
12 |
DUBIN Gas Power Plant |
Ireland |
Load Flow Studies Short Cicuit Studies Transient Stability Studies Transformer Energisation Studies Earthing Studies |
H&MV Engineers |
Substation Engineers |
Power |
ETAP 14.1 |
13 |
SA-2 Extension |
Kingdom of Saudi Arabia |
Short Circuit Studies Motor Starting Studies Relay Coordination CT Sizing Earthing Studies |
Nutek |
Nutek |
Process Industry |
ETAP 14.1 |
14 |
BUWAIB Water treatment |
Riyadh, Kingdom of Saudi Arabia |
Load Flow Studies Short Circuit Studies Relay Coordination Arc Flash Studies Insulation Coordination |
Madhura Consultants |
Water Treatment |
ETAP 14.1 |
|
15 |
Brittania Industies |
Rudrapur |
Safety Audit Overcurrent and Earth Fault Relay Coordination |
Brittania Industries |
Voltech |
Process Industry |
ETAP 14.1 |
16 |
District Cooling Plant |
Malaysia |
Load flow studies Short Circuit Studies Static and Dynamic Motor Starting Studies Transient Stability Studies Relay Coordination Arc Flash Studies Optimal Power flow |
GDC Cooling District |
Limitless Green Technology |
Water Treatment |
ETAP 14 |
17 |
2.5MW Fuel Power Plant |
Intel office, Bangalore |
Load flow studies Short Circuit Studies Relay Coordination Arc Flash Studies |
Intel, Bloom Energy |
L&T ECC |
Fuel Cell |
ETAP 14 |
18 |
KAPSARC |
Saudi Arabia |
Short Circuit Studies Relay Coordination |
Synergy – Saudi Arabia |
Pothigai Power Systems |
Process Industry |
ETAP 14 |
19 |
Dammam Airport |
Saudi Arabia |
Short Circuit Studies Relay Coordination |
Synergy |
Pothigai Power Systems |
Airports |
ETAP 16 |
20 |
Doha Mall |
Qatar |
Harmonic Study |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Infrastructures |
ETAP 16 |
21 |
Omega CS_1805020 |
Qatar |
Load flow studies Short Circuit Studies Relay Coordination Arc Flash Studies |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Process Industry |
ETAP 18 |
22 |
Abu Hamour Mall |
Qatar |
Short Circuit Studies Relay Coordination |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Infrastructures |
ETAP 19 |
23 |
CP5 |
Qatar |
Short Circuit Studies Relay Coordination |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Process Industry |
ETAP 19 |
24 |
Indian Navy |
Vizag |
Short Circuit Studies Relay Coordination |
Mak Controls |
Voltech |
Offshore |
ETAP 14 |
25 |
Al Rayan Stadium |
Qatar |
Short Circuit Studies Relay Coordination |
Winstar Electromechanical Qatar |
Elite Powertech Consortium |
Infrastructures |
ETAP 19 |
26 |
Biolab – Train 1 Expansion |
Saudi Arabia |
Load Flow studies Short Circuit Studies Relay Coordination Arc Flash Studies |
Biolab |
MRM |
Process Industry |
ETAP 19 |
27 |
Mylan Pharma Industries Ltd- Unit 8 |
Vizag |
Short Circuit Studies Relay Coordination Arc Flash Studies |
Mylan |
Mylan |
Process Industry |
ETAP 19 |
28 |
Mylan Pharma Industries Ltd- Unit 9 |
Vizag |
Short Circuit Studies Relay Coordination Arc Flash Studies |
Mylan |
Mylan |
Process Industry |
ETAP 19 |
29 |
Mudgal 20 MW Solar Power Plant |
Karnataka, India |
Power Evacuation Study |
SPML |
SPML |
Power |
ETAP 19 |
30 |
Baby Whipes |
Saudi Arabia |
Load Flow studies Short Circuit Studies Relay Coordination |
Synergy |
Pothigai Power Systems |
Process Industry |
ETAP 19 |
31 |
Arabian Petrochemical Company, Al-Jubail |
Saudi Arabia |
Short Circuit Studies Relay Coordination |
Madhura Consultants |
Ingenious Network India Private Limited |
Process Industry |
ETAP 19 |
32 |
KFIA Damman Airport |
Saudi Arabia |
Load Flow studies Short Circuit Studies Relay Coordination |
Synergy |
Pothigai Power Systems |
Airports |
ETAP 19 |
33 |
Pepsi Food Production Plant |
Jeddah – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 19 |
34 |
Pepsi Food Production Plant |
Riyadh – Saudi Arabia |
Short Cicuit Studies Relay Coordination Studies Arc Flash Studies |
PepsiCo |
Madhura Consultants |
Process Industry |
ETAP 19 |
35 |
Savannah Cement Plant |
Kenya |
Short Cicuit Studies Relay Coordination Studies |
Flsmith |
ModPro Engineers |
Process Industry |
ETAP 19 |
36 |
10 MW Solar Power Plant |
UP |
Power Evacuation Study |
ATRIA |
ATRIA |
Power |
ETAP 19 |
37 |
50 MW Solar Power Plant |
Hariyana |
Power Evacuation Study |
ATRIA |
ATRIA |
Power |
ETAP 19 |
38 |
Mylan Pharma Industries Ltd |
Nashik |
Short Circuit Studies Relay Coordination Arc Flash Studies |
Mylan |
Mylan |
Process Industry |
ETAP 19 |
39 |
SFSF |
Saudi Arabia |
Short Circuit Studies Relay Coordination Arc Flash Studies |
ABB Saudi |
KESTREL |
Process Industry |
ETAP 19.5 |
40 |
Petrochad |
Chad |
Load Flow studies Short Circuit Studies Relay Coordination |
Petrochad |
Network India Priva |
Process Industry |
ETAP 19 |
41 |
Almarai 40 MW Diesel Power plant |
Saudi Arabia |
Relay Coordination |
Pothigai Power Systems |
Power |
ETAP 19.5 |
|
42 |
KMML |
Kerala |
Load Flow studies Motor Starting Studies |
KMML |
ModPro Engineers |
Process Industry |
ETAP 19.5 |
43 |
NMDC |
Load Flow Studies Short Circuit Studies |
NMDC |
VADIM Infrastructure (VIPL) |
Process Industry |
ETAP 19.5 |
|
44 |
Saline water conversion corporation, water treatment plant |
Saudi Arabia |
Short Circuit Studies, Relay Coordination Studies |
Pothigai Power |
Pothigai Power |
Process Industry |
ETAP 19.5 |
45 |
Abu ghonema mountain tanks |
Saudi Arabia |
Short Circuit Studies, Relay Coordination Studies |
Pothigai Power |
Pothigai Power |
Process Industry |
ETAP 19.5 |
46 |
Coca Cola Production Plant |
Saudi Arabia |
Short Circuit Studies, Relay Coordination Studies |
Pothigai Power |
Pothigai Power |
Process Industry |
ETAP 19.5 |
47 |
New Naval Base Project |
Saudi Arabia |
Short Circuit Studies, Relay Coordination, Unit Protection |
ABB Saudi |
KESTREL |
Process Industry |
ETAP 19.5 |
48 |
30MW Solar Power plant along with 132kV/33kV substation |
Malaysia |
Short Circuit Studies, Relay Coordination, Unit Protection |
VELLD |
VELLD |
Solar |
ETAP 19.5 |
49 |
Sierra Leone Transmission Planning |
Sierra Leone |
Grid Impact Study ( i. Short Circuit Study ii. Power Quality Study (Harmonic Disturbance, Flicker) iii. Grid Compliance Analysis comply with Grid Code iv. Active Power Control v. Frequency Response Analysis vi. Reactive Power Support ) |
Thiraipuram |
Thiraipuram |
Electric Utilities |
ETAP 19.5 |
50 |
Nagpur Metro |
Nagpur |
Power Factor Correction study |
Maha Metro |
Maha Metro |
Rail |
ETAP 19.5 |
51 |
51 MW PV Solar Power Plant |
Madhya Padesh, India |
Power factor Correction and Power Quality study |
Renew Power |
– |
Solar |
ETAP 20.0 |
52 |
MV and LV Switchgear of Cooling Plant |
Doha, Qatar |
Review of Protection Coordination Study |
Winstar Electromechanical Qatar |
Winstar Electromechanical |
Process Industry |
ETAP 20.0 |
53 |
132kV Substation |
Malaysia |
Relay Coordination, Unit Protection |
VELLD |
VELLD |
Solar |
ETAP 20.0 |
54 |
2 * 72 MW Waste heat Power Plant |
Singapore |
Load Flow, Short Circuit, Motor Starting, Transient Stability, Relay Coordination, Harmonic Analysis |
ABB Singapore |
ABB Singapore |
Power |
ETAP 20.0 |
55 |
10 * 2 MW Diesel Generator Plant |
India |
Short Circuit Studies and Relay Coordination Study |
Mak Controls |
Mak Controls |
Process Industry |
ETAP 20.0 |
56 |
Hamad International Airport |
Qatar |
Short Circuit Studies, Relay Coordination Study and Arc Flash Study |
Winstar Electromechanical Qatar |
Winstar Electromechanical |
Airports |
ETAP 20.0 |
57 |
Ramagundam Fertilizers Complex (RFCL) |
India |
Short Circuit Studies and Relay Coordination Study |
Thiraipuram |
Thiraipuram |
Process Industry |
ETAP 20.0 |
58 |
VOPAK |
Saudi Arabia |
Short Circuit Studies and Relay Coordination Study |
KESTREL |
KESTREL |
Process Industry |
ETAP 20.0 |
59 |
11 kV Switchgear Retrofit |
Qatar |
Relay Coordination Study |
Winstar Electromechanical Qatar |
Winstar Electromechanical |
Process Industry |
ETAP 20.0 |
60 |
Aurrel i-TechIES Private Limited |
India |
Arc Flash Study and TS |
GE |
Aurrel i-TechIES Private Limited |
Process Industry |
ETAP 20.0 |
61 |
Port – IVORY COAST |
IVORY COAST |
Load Flow, SHort Circuit, Motor Starting, Relay Coordination |
RINA |
RINA |
Process Industry |
ETAP 20.0 |
62 |
Protection Coordination |
Saudi Arabia |
Relay Coordination |
Ingenious |
Ingenious |
Process Industry |
ETAP 20.0 |
63 |
10 * 2 MW Diesel Generator Plant |
India |
Short Circuit Studies and Relay Coordination Study |
Mak Controls |
Mak Controls |
Process Industry |
ETAP 20.0 |
64 |
Q Terminal |
Saudi Arabia |
Relay Coordination |
KESTREL |
KESTREL |
Process Industry |
ETAP 20.0 |
65 |
27 MW Cogeneration Plant |
India |
Transient Stability Studies |
GE |
GE |
Power |
ETAP 20.5 |
66 |
30MW Kedah Solar Power Plant |
Malaysisa |
Short Circuit Study & Protection co-ordination |
VELLD |
VELLD |
Solar |
ETAP 20.5 |
67 |
KURDISTAN PIPELINE COMPANY PTE LTD. |
IRAQ |
Protection co-ordination |
KPC |
Exidasp |
Oil & Gas |
ETAP 20.5 |
68 |
40 Feeder Project |
Saudi Arabia |
Short Circuit Study & Protection co-ordination |
Synergy |
Synergy |
Oil & Gas |
ETAP 20.5 |
69 |
South Ahamdi – Construction of New House |
Kuwait |
Short Circuit Study & Protection co-ordination |
KOC |
HEISCO |
Oil & Gas |
ETAP 20.5 |
70 |
ADDC |
Abu Dhabi |
Load Flow, Short Circuit, Motor Starting, Harmonic Analysis, Protection setting calculation in LV & MV |
ABU DHABI TRANSMISSION & DESPATCH COMPANY |
DANWAY-ELECTRICAL |
Power |
ETAP 20.5 |
71 |
COLT Data Center |
Mumbai |
Load Flow, Short Circuit, Motor Starting, Harmonic Analysis, Transient Stability, Protection setting calculation in LV & MV, Unit protection, Arc Flash, Reliability Analysis |
COLT |
Sterling Wilson |
Data Center |
ETAP 20.5 |
72 |
New port Qatar Airport |
Qatar |
Protection co-ordination |
ABB |
Kestral |
Airports |
ETAP 20.5 |
73 |
22 kV Substation and RMU |
Ethiopia |
Short circuit analysis |
IMEX |
IMEX |
Power |
ETAP 20.5 |
74 |
Suven Pharma |
Hyderabad |
Arc Flash studies |
Sri Gayathri energy services |
Sri Gayathri energy services |
Pharmaceutical |
ETAP 20.5 |
75 |
26 MW Hydro Power Plant |
Vietnam |
Short circuit analysis |
BFL |
BFL |
Power |
ETAP 20.5 |
76 |
GE Industrial Complex |
India |
Arc Flash studies |
GE |
GE |
Manufacturing |
ETAP 20.5 |
77 |
Irrigation Pumping Station – 16 MW SRIM |
Andhra Pradesh |
Motor acceleration studies |
– |
Radical power Solutions |
Power |
ETAP 20.5 |
78 |
2 MW Rooftop Solar Power Plant |
Banglore |
Load Flow, Short Circuit |
HPCL |
Bataan solar |
Solar |
ETAP 20.5 |
79 |
15 MW Solar Power Plant |
New York,USA |
Load flow Studies – Reactive Power Compensation studies |
MG CONSULTANT |
MG CONSULTANT |
Solar |
ETAP 20.5 |
80 |
300 MW Solar Power Plant |
Rajasthan |
Load flow, Short circuit and Relay co-ordination |
Renew Power |
GE |
Solar |
ETAP 20.5 |
81 |
Jawaharlal Nehru Port |
India |
Load flow, Short circuit, Motor Starting, Relay co-ordination, Arc flash |
JNPT |
RINA |
Airports |
ETAP 21 |
82 |
KURDISTAN PIPELINE COMPANY PTE LTD |
Iraq |
Load flow, Short circuit, Motor acceleration study, Harmonic Analysis, RAM study & Transient Overvoltage Study |
KPC |
EXIDASP |
Oil & Gas |
ETAP 21 |
83 |
11 kV Switchgear Modification |
Qatar |
Load flow, Short circuit and Relay co-ordination |
Winstar Electromechanical Qatar |
WINSTAR |
Oil & Gas |
ETAP 21 |
84 |
AL-Shabbagh |
Oman |
Short circuit & Harmonics analysis |
AL-Shabbagh |
AL-Shabbagh |
Oil & Gas |
ETAP 21 |
85 |
Suven Pharma Ltd |
Andhra Pradesh |
Arc Flash |
Suven Pharma |
Sri Gayatri energy services |
Pharmaceutical |
ETAP 21 |
86 |
Stevin Rock/ Rak Rock Switching station |
Dubai |
Short circuit and Realy co-ordination |
Kestrel |
Kestrel |
Power |
ETAP 21 |
87 |
Dasami Lab Pvt Ltd |
Andhra pradesh |
Short Circuit Studies, Relay Coordination Studies, Arc Flash |
DASAMI LAB PVT LTD |
DASAMI LAB PVT LTD |
Pharmaceutical |
ETAP 21 |
88 |
Jeddah Airport |
Saudi Arabia |
Load flow, Short circuit, Motor acceleration studies, Relay Coordination, Arc flash studies, Harmonic Analysis |
Jeddah Althaniya Water Company (JAWC) |
Saudi Services for Electro Mechanic Works Co. (SSEM) |
Airports |
ETAP 21 |
89 |
2 * 600 MW Thermal Power Plant |
Anuppur, Madhya Pradesh |
l.oad flow, Short circuit and Motor acceleration studies |
MosearBear |
TCE |
Power |
ETAP 21 |
90 |
Laurus Lab Ltd – Unit 3, 4 & 6 |
Andhra Pradesh |
Short Circuit Studies, Relay Coordination Studies, Arc Flash |
Laurus lab ltd |
Sri Gayatri energy services |
Pharmaceutical |
ETAP 21 |
91 |
400V DG Load Sharing and Load shedding |
UAE |
Load flow, Short Circuit, Motor starting, Harmonics, Transient Stability |
GKPI |
Exidasp |
Oil & Gas |
ETAP 21 |
92 |
1500 MW Sudiar Solar Power Plant |
Saudi Arabia |
Relay coordination, Unit Protection, AC & DC Arc flash studies |
L&T ECC |
L&T ECC |
Solar |
ETAP 21 |
93 |
65 MW Solar Power Plant |
India |
Relay coordination, Unit Protection |
REFEX |
ACE |
Solar |
ETAP 21 |
94 |
Training on Power System studies using ETAP |
Coimbatore India |
ETAP Training |
NOVATEC |
NOVATEC |
N/A |
ETAP 21 |
95 |
30MW Solar Power Plant |
USA |
Load flow Short Circuit |
KEENTEL |
KEENTEL |
Solar |
ETAP 21 |
96 |
Qatar Gas Operating Company Ltd |
Qatar |
Relay Coordination |
Petrotec |
Petrotec |
Manufacturing |
ETAP 21 |
97 |
Kalyani Steels Ltd |
India |
Load flow, Short Circuit, Relay coordination, Unit Protection, Arc flash Studies |
Kalyani Steel |
RELTEC |
Minerals & Metals |
ETAP 21 |
98 |
Fujarah Airport |
Saudi Arabia |
Relay Coordination |
KESTREL |
Airports |
ETAP 21 |
|
99 |
JCB Manufacturing Unit |
India |
Arc flash STudies |
JCB |
SGS Controls |
Manufacturing |
ETAP 21 |
100 |
NEOM – 1650 MW Wind, 2400 MW Solar, 400 MW Battery |
Saudi Arabia |
Reactive Power Compensation, Input Preparation |
Air Products |
L&T ECC |
Solar |
ETAP 21 |
101 |
STT Data Center |
India |
Load flow, Short Circuit, Relay coordination, Unit Protection, |
STT Data Center Chennai |
ABM |
Data Center |
ETAP 21 |
102 |
National Fertilizer Limited |
India |
Load flow, Short Circuit, Relay coordination, Unit Protection, Arc flash Studies, Transient Stability |
National Fertilizer |
TCE |
Process Industry |
ETAP 21 |
103 |
Hetero Drugs Ltd |
India |
Arc Flash Studies |
HETROS LAB |
SAFEECO |
Pharmaceutical |
ETAP 21 |
104 |
200 MW Solar Power Plant |
Uzbekistan |
Reactive Power Compensation, Input Preparation |
MASDAR |
UZASSYSTEM |
Solar |
ETAP 21 |
105 |
Qatar gas Operating Company Ltd |
Qatar |
Relay Coordination |
Winstar Electromechanical Qatar |
WINSTAR |
Manufacturing |
ETAP 21 |
106 |
30 MW Solar Power Plant -132 / 33 kV Substation |
Malaysia |
Relay Coordination, Unit Protection |
TNB |
VELLD |
Solar |
ETAP 21 |
107 |
Jatim Steel |
Indonesia |
Relay Coordination |
Jatim Steel |
ABB |
Manufacturing |
ETAP 22 |
108 |
Orb energy Private Ltd |
Karnataka, India |
Relay Coordination, Unit Protection |
Orb energy |
Orb energy |
Solar |
ETAP 22 |
109 |
Suguna Spong & power Private Ltd |
Thadipatri |
Load flow, Short Circuit Studies, Transient Stability,Harmonic Study, Relay Coordination Study |
Suguna Spong & power |
Suguna Spong & power |
Manufacturing |
ETAP 22 |
110 |
Hamad International Airport – 5 Substation Expansions |
Qatar |
Load flow, Short Circuit Studies, Relay Coordination Study and Arc Flash Study |
Winstar Electromechanical Qatar |
Winstar Electromechanical |
Manufacturing |
ETAP 22 |
111 |
GAIL Petrotec Complex |
Auraiya,Uttat Pradesh |
Relay Coordination, Unit Protection |
GAIL |
TCE |
Petrochemicals and Refining |
ETAP 22 |
112 |
Supergas |
Tuticorin |
Short circuit and Realy co-ordination |
SHV Energy |
SHV Energy |
Oil & Gas |
ETAP 22 |
113 |
Addverb Technologies |
Noida |
Arc flash |
Addverb |
Addverb |
Manufacturing |
ETAP 22 |
114 |
Training on Solar Power Plant Design and Energy Estimation using PVsyst |
Thiruverkadu |
ETAP Training |
SA College |
SA College |
N/A |
ETAP 22 |
115 |
TREI |
VIZAG |
Arc Flash |
TREI |
TREI |
Manufacturing |
ETAP 22 |
116 |
Bill forge |
Bangalore |
Arc flash, LPS & Electrical Safety Audit |
RELTEC |
RELTEC |
Manufacturing |
ETAP 22 |
117 |
Laurus lab Ltd |
VIZAG |
Arc Flash |
Sri gayathri |
Sri gayathri |
Manufacturing |
ETAP 22 |
118 |
TITAN Manufacturing Plant |
Hosur |
Arc flash & LPS |
TITAN |
TITAN |
Manufacturing |
ETAP 22 |
119 |
Qatar Company for Airports Operation and Management |
Qatar |
RC |
– |
Winstar |
Power |
ETAP 22 |
120 |
Hamad International Airport – CSN & CSE Expansions |
Qatar |
Unit Protection |
– |
Winstar |
Power |
ETAP 22 |
121 |
Hamad International Airport – Non Essential and Essential Supply Compact Substation |
Qatar |
RC |
– |
Winstar |
Power |
ETAP 22 |
122 |
27.5MWp Solar Plant |
Karnataka |
LF,SC,RC |
Everrenew |
Everrenew |
Solar |
ETAP 22 |
123 |
Qatar Gas |
Qatar |
Short circuit and Relay Coordination |
Qatar Gas Operating Company Ltd. |
Winstar LLC |
Oil & Gas |
ETAP 22 |
124 |
Al Mostawi Reservoir |
Saudi Arabia |
Relay Coordination |
MEWA |
SSEM |
Water Treatment |
ETAP 22 |
125 |
Mahindra CIE Automotive Ltd, Plant IV |
Coimbatore |
Arc Flash Study & Electrical Safty Audit |
Mahindra CIE Ltd |
RELTEC |
Manufacturing |
ETAP 22 |
126 |
22/0.415kV Data Centre Plant |
Dubai |
Short Circuit, Relay Coordination, Arc Flash |
Mega power |
Mega power |
Data center |
ETAP 22 |
127 |
AD Dhakhiliyah water transmission system |
Oman |
Relay Coordination Study |
DIAM |
L&T |
Water Treatment |
ETAP 22 |
128 |
Expansion of Existing 5MMTPA Capacity to 10MMTPA Capacity of Ennore LNG |
Ennore |
Load Flow, Short Circuit, Motor Starting |
IOLPL |
RINA |
Oil & Gas |
ETAP 22 |
129 |
Zubair oil field |
Iraq |
Load Flow, Short Circuit, Motor Starting, Relay coordination |
ZPOD |
KSS energy consultants / ARD |
Oil & Gas |
ETAP 22 |
130 |
Kreative Organic Private Ltd |
hyderabad, india |
Arc Flash |
Kreative Organic pvt. ltd |
Sri gayathri |
Manufacturing |
ETAP 22 |
131 |
Numaligarh Refiniery Ltd |
Assam, India |
Load Flow & Short Circuit Study Report Motor Starting Study Report Harmonics Study Report Transient Stability Study Report (Optional) Load Shedding Study Report (Optional) Relay coordination study Report \ |
Numaligarh Refinery Limited |
Tecnip / Tecton |
Manufacturing |
ETAP 22 |
132 |
ST Telemedia Global Data Centres |
Delhi, India |
Load Flow Report Short Circuit Report Relay coordination study Report |
ST TELEMEDIA GLOBAL DATA CNETRES |
Crescon projects and services Pvt. Ltd. |
Manufacturing |
ETAP 22 |
133 |
Manpower Support |
Oman |
Manpower Support for Engineering |
– |
HES |
Manufacturing |
ETAP 22 |
134 |
Training on Protection Relays |
Jaisalmer |
Training on Protection Relays |
Renew Power |
Renew Power |
Renewables |
ETAP 22 |
135 |
3 MTPA Paste Fill Plant |
Madhya Pradesh |
Load Flow & Short Circuit Study Report Motor Starting Study Report Harmonics Study Report Relay coordination study Report |
Hindusthan Copper Ltd |
RDB Encon |
Minerals & Metals |
ETAP 22 |
136 |
RA Chem Pharma Ltd |
Hydrabad |
Arc Flash Study |
Cohance |
Cohance |
Pharmaceutical |
ETAP 22 |
137 |
2*32 MW Gas Turbine Power Plant |
Russia |
Transient Stability |
Tashkent HPP |
TCE |
Power |
ETAP 22 |
138 |
Pyramid Lake microgrid project |
USA |
Load Flow, Short circuit, Grounding, Relay coordination, ArcFlash |
Maxwell faraday |
Maxwell faraday |
Microgrid |
ETAP 22 |
139 |
Replacement of 33kV Underground cables in DGS-N to H Area |
Iraq |
Cable Replacment Engineering works |
ZPOD |
KSS energy consultants / ARD |
Oil & Gas |
ETAP 22 |
140 |
11kV 2.7MVA Garmian Block |
Kurdistan |
Load Flow, Short circuit, Relay coordination, |
Ministry of Iraq |
Exisdasp |
Oil & Gas |
ETAP 22 |
141 |
Aurobindo Pharma Ltd |
Hyderabad |
Arc flash studies |
M/s. Aurobindo Pharma |
Indus |
Manufacturing |
ETAP 22 |
142 |
25MW AC Solar Power Plant |
Tamilnadu, India |
Relay Coordination, Unit Protection |
Acerenewtech |
Solar |
ETAP 22 |
|
143 |
FGD of Thermal Power Plant |
India |
Load Flow, Short circuit, Motor starting Relay coordination, |
– |
TCE |
Power |
ETAP 22 |
144 |
Coromandel International Ltd |
Andhra pradesh |
Load Flow, Short circuit, Motor starting Transienrt stablity Relay coordination, |
Coromandel |
Coromandel |
Minerals & Metals |
ETAP 22 |
145 |
Lauras Labs Ltd |
Andhra pradesh |
Arc flash studies |
Lauras Lab |
Gayathri |
Pharmaceutical |
ETAP 22 |
146 |
Iron ore handing and evacution system |
Odisha |
Relay Coordination |
Odisha Mining Corporation |
HOWE / TEED |
Minerals & Metals |
ETAP 22 |
147 |
FAIR & AQAH Substation |
UAE |
Relay coordination |
– |
KESTREL |
Power |
ETAP 22 |
148 |
Vermilton Rise 185MW Solar Power Plant |
USA |
Load flow. Short circuit, Cable ampacity, Energy loss study |
Axial Energy |
Ace Renewtech |
Solar |
ETAP 22 |
149 |
Quantum Switch Data Center |
Qatar |
Load flow. Short circuit, Relay coordiantion, Arc Falsh |
Q DATA / Quantum Switch |
Winstar LLC |
Data center |
ETAP 22 |
150 |
Quest ETAP Consultant Services |
Banaglore,India |
ETAP Consultant services |
– |
Quest Global |
Oil and Gas |
ETAP 22 |
151 |
Burnt Peak microgrid project |
USA |
Load Flow, Short circuit, Grounding, Relay coordination, ArcFlash |
Maxwell faraday |
Maxwell faraday |
Microgrid |
ETAP 22 |
152 |
800.215MWp Al Kharsaa Solar Power Plant |
Qatar |
Energy Flow & Power Impact studies to analyze the losses and low performance of the Al Kharsaa PV |
Siraj 1 |
Power China |
Solar |
ETAP 22 |
153 |
SPV 50MW Ground Mounted solar Power Plant |
Bjilai,Chatttisgarh |
Relay coordination and validation |
Shresha RoofToop solar PV / Southeast central Railway |
Refex |
Solar |
ETAP 22 |
154 |
Carboline India Private Limited Coatings and fireproofing |
Chennai, India |
Arc flash study |
Carboline |
Carboline |
Manufacturing |
ETAP 22 |
155 |
Akyem Open-Pit Gold Mine |
Ghana |
Arc flahs study |
Teslaghana |
Teslaghana |
Manufacturing |
ETAP 22 |
156 |
Cable interconnection diagram |
Dubai |
Cable interconnection diagram |
ADNOC |
– |
Oil and Gas |
ETAP 22 |
157 |
100MW (39MW Wind+60MW Solar) Hybrid Power Project |
– |
Line Loss study |
– |
Everrenew |
Solar |
ETAP 22 |
158 |
485MW APZ Zarqa CCGT Power Plant and 50MW AP Risha Solar Plant |
Jordan |
Arc Flash Study |
ACWA |
Khalid |
Solar |
ETAP 22 |
159 |
Dubai International Airport |
UAE |
Corodination study |
Etisalat |
DULAND TECHNICAL SERVICES LLC |
Airports |
ETAP 22 |
160 |
Lucknow international airport |
Lucknow |
Load Flow, Short circuit |
Adani |
Egis India |
Airports |
ETAP 22 |
161 |
Khazna Data Center |
Dubai |
Relay Coordination |
Khazana |
AASA Group |
Data center |
ETAP 22 |
162 |
Honeywell Data Center |
Madurai, India |
Short circuit, Relay coordiantion, Arc Falsh |
Honeywell |
Honeywell,Madurai |
Data center |
ETAP 22 |
163 |
Training on Power System Study using ETAP |
Durgapur,India |
ETAP Training |
– |
Pinacle Infotech |
Corporate Training |
ETAP 22 |
164 |
ISRO EHT/HT Power System |
India |
Short circuit, Relay coordiantion, Transformer Protection |
ISRO |
ISRO |
Power |
ETAP 22 |
165 |
250MW Lignite Fired Power Plant |
India |
Arc Flash Study |
TAQA Neyveli Power Company Pvt, Ltd |
TAQA Neyveli Power Company Pvt, Ltd |
Power |
ETAP 22 |
166 |
Engineering design for 180MW (100MWSolar + 80Wind) Hybrid Power Project |
India |
Short circuit, Relay coordiantion, AC ventililation sizing & Layout Fire Fighting Layout |
Everrenew |
Everrenew |
Solar |
ETAP 22 |
167 |
Training on Power System Study using ETAP |
India |
ETAP Training |
RND Power Engineer |
RND Power Engineer |
Corporate Training |
ETAP 22 |
168 |
CIE Hosur Limited |
India |
Arc Flash, Thermography Safety Audit LA Mapping |
CIE Hosur Limited |
CIE Hosur Limited |
Process |
ETAP 22 |
169 |
16 MVA Manufacturing Plant |
India |
Relay coordination |
Alcalab india Pvt Ltd |
Alcalab india Pvt Ltd |
Process |
ETAP 22 |
170 |
Godavari Biorefineries LTd |
India |
Relay coordination |
Reltec |
Reltec |
Process |
ETAP 22 |
171 |
Electrical System Study for 726 MW Combined Cycle Power plant |
India |
Electrical System Study |
ONGC Tripura Power Company Ltd |
ONGC Tripura Power Company Ltd |
Water |
ETAP 22 |
172 |
Training on Power System Studies using ETAP |
UAE |
ETAP Training |
Dragon oil |
Dragon oil |
Corporate Training |
ETAP 22.5 |
173 |
Training on Lighting Control Design |
India |
Lighting control design Training |
Pinnacle infotech |
Pinacle Infotech |
Corporate Training |
ETAP 22.5 |
174 |
180MW Solar Plant |
India |
Relay Coordination Study |
Adani |
Etricals Engineers Private Limited |
Solar |
ETAP 22.5 |
175 |
DGS-N all 33kV, 11kV, 6kV & 0.4kV Switchgears |
Iraq |
Load Flow, Short Circuit, Motor Starting Harmonic Study Relay coordiantion, |
ZPOD |
KSS energy consultants |
Oil and Gas |
ETAP 22.5 |
176 |
ZUBAIR DGS – Provision of Ventilation Systems in DGS-N |
Iraq |
Enginering Services |
ZPOD |
KSS energy consultants |
Oil and Gas |
ETAP 22.5 |
177 |
Training on Power System Studies using ETAP |
India |
ETAP Training |
Toyo Engineering |
Toyo Engineering |
Oil and Gas |
ETAP 22.5 |
178 |
Plate mill Revamp |
Singapore |
Load Flow, Short Circuit, Relay coordination, |
ABB SG |
ABB SG |
Process |
ETAP 22.5 |
179 |
IOLCP Plant |
Punjab, India |
Arc Flash |
IOLCP |
IOLCP |
Manufacturing |
ETAP 22.5 |
180 |
HALUL & NFA Complex |
Qatar |
Load flow, short circuit, Relay coordination |
Qatar Energy |
Converse Technologies |
Infrastructures |
ETAP 22.5 |
181 |
Changdad Substation |
India |
Relay coordination |
Olam agro |
Reltec |
Infrastructures |
ETAP 22.5 |
182 |
70MW Solar Plant |
UP, India |
Load Flow |
Fourth Partner |
Fourth Partner |
Solar |
ETAP 22.5 |
183 |
Training on Power System Study using ETAP |
India |
ETAP Training |
Tanezco & Kalpataru power |
RND Power Engineer |
Corporate Training |
ETAP 22.5 |
184 |
38MW Solar Plant |
Tamilnadu, India |
Root cause analysis |
First Energy |
Everrenew |
Solar |
ETAP 22.5 |
185 |
20BMA01 Switchgear (18nos of feeder) |
Qatar |
RC |
Soofi |
soofi |
Oil and Gas |
ETAP 22.5 |
186 |
Porus Laboratories Units – Atchutapuram and Parwada |
Visakhapatnam,India |
Arc flash |
Porus Labs |
Porus Labs |
Pharmaceutical |
ETAP 22.5 |
187 |
NFE1 QG Camp |
Qatar |
LF,SC,RC |
Qatar Gas company |
Petrotec |
Substaton |
ETAP 22.5 |
188 |
KSS Wells Electrification |
Iraq |
Load flow, short circuit, Relay coordination |
KSS |
KSS |
Substaton |
ETAP 22.5 |
189 |
DGS N Substation Instrumentation Work |
Iraq |
Fire and gas system |
KSS |
KSS |
Substaton |
ETAP 22.5 |
190 |
132kV GIS Substation |
Iraq |
Pre Bid Engineering Support |
KSS |
KSS |
Substaton |
ETAP 22.5 |
191 |
Hertz Electricals – Schaeffler |
Hosur, India |
Arc Flash |
Schaffler |
Hertz Electricals |
Manufacturing |
ETAP 22.5 |
192 |
300MW Solar plant |
Bikaner, India |
Harmonic Measurement and Analysis |
Enel |
Enel |
Solar |
ETAP 22.5 |
193 |
Teleflex Private Limited |
Puducherry |
Arc Flash |
Teleflex |
Teleflex |
Manufacturing |
ETAP 22.5 |
194 |
MOD Fast track project |
Iraq |
Load flow, short circuit, Relay coordination |
KSS |
KSS |
Substaton |
ETAP 22.5 |
195 |
2 MW Solar Plant |
Maharastra, India |
Short circuit, Relay coordination, Arc Flash |
Total Energy |
Total Energy |
Solar |
ETAP 22.5 |
196 |
Kemin Industries South Asia Pvt.Ltd |
Chennai, India |
Arc Flash Study |
Kemin |
Kemin |
Substation |
ETAP 22.5 |
197 |
Detail design of Permanent Power Supply through overhead line (KPS2 TO RETM) and establishment of new substation in RETM |
Kurdistan |
Load flow, short circuit, Relay coordination, Transient Overvoltag |
KPC |
Exidasp |
Substation |
ETAP 22.5 |
198 |
Training on Power system analysis using ETAP |
Online |
Load flow, short circuit, Relay coordination |
SEIL ENERGY |
SEIL ENERGY |
Corporate Training |
ETAP 22.5 |
199 |
Cable Ampacity |
Cable Ampacity |
Kestrel |
KESTREL |
Substation |
ETAP 22.5 |
|
200 |
90MW Anta Solar Power Plant |
Rajasthan, India |
LF,SC,RC |
NTPC |
Amararaja |
Solar |
ETAP 22.5 |
201 |
Crystal Industrial Park B-400 Bhayla (COCA-COLA WAREHOUSE) |
Ahmedabad, India |
Arc Flash Study |
FABS Management Services PTE Ltd. |
FABS Management Services PTE Ltd. |
Process |
ETAP 22.5 |
202 |
1500 MW Al Dibdida Solar Power Plant |
Kuwait |
Load Flow studies Short Circuit Studies Harmonic Analysis |
L&T ECC |
L&T ECC |
Solar |
ETAP 19 DigSILENT |
203 |
ABB Bangalore |
India |
Transient Stability Studies User Defined Model Development for AVR, Governor Unit Protection Insulation Coordination |
Dangote |
EIL |
Oil & Gas |
ETAP ,PSCAD |
204 |
Sterling Wilson Chennai |
Chennai |
Microgrid Consulting Services |
Sterling Wilson |
Sterling Wilson |
Microgrid and Energy Storage |
ETAP DigSILENT PSCAD HOMER |
205 |
Nxtra Data Center |
Pune |
Load Flow Studies, Short Circuit Studies, Motor Acceleration Studies,, Transient Studies, Harmonic Analysis, Relay Coordination Studies, Arc Flash Studies, Earthing, Transformer Energisation Studies |
Microsoft, STT |
Sterling Wilson |
Data Center |
ETAP 19.5 PSCAD |
206 |
STT Data Center |
Chennai |
Load Flow Studies, Short Circuit Studies, Motor Acceleration Studies,, Transient Studies, Harmonic Analysis, Relay Coordination Studies, Arc Flash Studies, Earthing, Transformer Energisation Studies |
Microsoft, STT |
STT |
Data Center |
ETAP 19.5 PSCAD |
207 |
250 MW Solar Power Plant |
India |
Insulation Coordination, Harmonic measurement, Harmonic analysis |
SPRING Energy |
L&T ECC |
Solar |
ETAP, PSCAD |
208 |
Integration of WTG & BESS with FPSO |
Brazil |
LF,SC,TS, BESS |
BW offshore |
ABB SG |
Offshore |
ETAP / DigSILENT |
209 |
220/33kV IOCL Refinery |
Gujarat |
Insulation Co-ordination, Load flow, Short Circuit, Harmonic Analysis,Relay Cordination Report |
IOCL |
Siemens |
Oil and Gas |
PSCAD & ETAP |
210 |
Port of Tyne, NewCastle BESS |
UK |
Short circuit studies, Protection Coordination Studies |
RES |
EPS |
BESS |
ETAP/ DigSILENT |
211 |
220/33kV Substation |
Insulation Coordination |
Tata Steel |
Siemens |
Manufacturing |
PSCAD & ETAP |
|
212 |
Root Cause analysis for 800.215MWp Al Kharsaa Solar power |
Qatar |
Root cause analysis for power dip for the solar palnt |
Siraj 1 |
Power China |
Renewables |
ETAP 20 PSCAD |
213 |
Back up Power Supply to DGS N – Supply of containerized substation for SS-01 & 02 |
Iraq |
Package Substation Engineering for LLI items |
ZPOD |
KSS energy consultants |
Oil and Gas |
AutoCAD,ETAP |
214 |
OPEN CYCLE GAS TURBINE GENERATING STATION- STAGE 1A |
Singapore |
Insulation Coordination Study for (PSCAD) 400kV GIS ▪ Temporary Over Voltage ▪ Slow Front Overvoltage ▪ Fast Front Overvoltage • Transformer Energization Study • PSS Voltage Regulator Stability Study • Transient Stability Study |
– |
YD |
Power |
PSCAD / ETAP / Matlab |
215 |
Noida International Airport |
Uttar Pradesh,India |
Load Flow, Short Circuit, Motor Starting Relay coordiantion, Arc Falsh Insulation Cordination Traning on ETAP |
Noida Internationl Airport |
Tata Projects |
Airports |
ETAP / PSCAD |
216 |
Keppel Sakra Cogen 600MW Advanced Gas Turbine Cogeneration Combined Cycle Plant |
Singapore |
Insulation Coordination Study for (PSCAD) 400kV GIS ▪ Temporary Over Voltage ▪ Slow Front Overvoltage ▪ Fast Front Overvoltage • Transformer Energization Study • PSS Voltage Regulator Stability Study • Transient Stability Study |
– |
YD |
Power |
PSCAD / ETAP /Matlab |
217 |
ZUBAIR DGS – Electrical LV Load Separation |
Iraq |
Engineering service for new package substation |
ZPOD |
KSS energy consultants |
Oil and Gas |
AutoCAD,ETAP |
218 |
Banyan CCP4 Project |
Singapore |
Insulation Coordination Study for (PSCAD) 400kV GIS ▪ Temporary Over Voltage ▪ Slow Front Overvoltage ▪ Fast Front Overvoltage • Transformer Energization Study • PSS Voltage Regulator Stability Study • Transient Stability Study |
Sembcorp |
YD Consulting |
Power |
PSCAD / ETAP 22.5 / Matlab |
219 |
Feasiblity Study for Power Extension |
Thipura,India |
Feasibility Engineering |
ONGC Tripura Power Company Ltd |
ONGC Tripura Power Company Ltd |
Water |
ETAP 22, AutoCAD |
PSCAD
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
66kV Double Circuit Transmission Line |
Jordan |
Insulation Coordination |
Theji Constructions Pvt Ltd |
Theji Constructions Pvt Ltd |
Electric Utilities |
PSCAD 5.0 |
2 |
110/38kV Substation |
Ireland |
Insulation Coordination |
Substation Engineers |
Substation Engineers |
Electric Utilities |
PSCAD 5.0 |
3 |
GOSP4 115 kV Substation |
Saudi Arabia |
Insulation Coordination |
GE |
Ingenious Network FZC, UAE |
Electric Utilities |
PSCAD 5.0 |
4 |
ZULUF 230 kV Substation |
Saudi Arabia |
Insulation Coordination |
GE |
Ingenious Network FZC, UAE |
Electric Utilities |
PSCAD 5.0 |
5 |
110/38 kV Rosspile /Gillinstown |
Ireland |
Insulation co-ordination study |
H&MV Engineers |
Substation Engineers |
Power |
PSCAD 5.0 |
6 |
AL BARAHA Super 1 GIS – 400/220 kV |
Qatar |
Insulation co-ordination study |
L&T ECC |
L&T ECC |
Power |
PSCAD 5.0 |
7 |
120 MW Thermal Power Plant |
Gummudipoondi |
Transformer Energisation |
Suryadev |
Suryadev |
Power |
PSCAD 5.0 |
8 |
300MW Solar Power Plant |
Rajasthan |
Harmonic Resonance study |
SB Energy |
SB Energy |
Solar |
PSCAD 5.0 |
9 |
Training on Short Circuit Study |
Bangalore |
Training on Short Circuit Study |
BFL |
BFL |
Power |
PSCAD 5.0 |
10 |
110/38 kV Rosspile /Gillinstown |
Ireland |
Insulation co-ordination study |
H&MV Engineers |
H&MV |
Power |
PSCAD 5.0 |
11 |
Training on Insulation Coordination using PSCAD |
Banglore |
Training for Insulation Coordination |
Balfour Beatty |
Balfour Beatty |
Infrastructures |
PSCAD 5.0 |
12 |
APOC PDH – UTOS 220 kV GIS Substation |
Saudi Arabia |
Insulation co-ordination |
GE |
Ingenious |
Power |
PSCAD 5.0 |
13 |
220/33kV wind farm pooling substation |
Kachchh Gujarat |
Insulation coordination |
– |
NS Engineers |
Power |
PSCAD 5.0 |
14 |
SAAD IPP 300MW Solar Power Plant |
Saudi Arabia |
Insulation Coordination Study report (TOV, SFO, FFO) |
Saudi power procurment company/ Al Ghazala Energy Company |
Elesewedy Electric / Suggr Energy |
Solar |
PSCAD 5.0 |
15 |
220/33kV Reliance Life Science Substation |
India |
Insulation Coordination Study report (TOV, SFO, FFO) |
Reliance |
Siemens |
Power |
PSCAD 5.0 |
16 |
Training on Insulation Coordination studies using PSCAD |
Chennai, India |
Advacned PSCAD Training |
Hitachi |
Hitachi |
Corporate Training |
PSCAD 5.0 |
17 |
Training on Insulation Coordination studies using PSCAD |
Bangalore, India |
Advanced PSCAD Training |
ABB |
ABB |
Corporate Training |
PSCAD 5.0 |
18 |
Training on PSS tuning using PSSE |
Bangalore, India |
Advanced PSCAD Training |
ABB |
ABB |
Corporate Training |
PSCAD 5.0 |
19 |
Technical Feasibility Study for Decentralise Energy Project |
India |
Load Flow, Short Circuit, Tramsient Stability Transformer Energisation Cable Energisation |
ChakrInnovation |
ChakrInnovation |
Process |
PSCAD 5.0 |
20 |
PSCAD simulation Model / For Open Access Kamuthi Project |
India |
Reactive power compensation |
Enerparc Energy Private Limited |
Enerparc Energy Private Limited |
Solar |
PSCAD 5.0 |
21 |
Training on Insulation Coordination Studies using PSCAD |
India |
PSCAD Training |
Kent |
Kent |
Corporate Training |
PSCAD 5.0 |
22 |
Technical Feasibility Study for Decentralised Energy Project |
India |
Pre magnetizing Transformer Point on wave switching Synchronising 11kV |
ChakrInnovation |
ChakrInnovation |
Process |
PSCAD 5.0 |
23 |
220kV GIS Substation for Manufacturing Unit of LI-ION Cell |
India |
Insulation Coordination Transformer Energisation Ferro Resonance Relay Coordination Unit Protection Cable Sizing LV Power and Control Cable Schedule Engineering |
Exide Battery |
Hitachi |
Manufacturing |
PSCAD 5.0 |
24 |
Training on Insulation Coordination study using PSCAD |
Ahemadabad |
PSCAD Training |
Adani |
Adani |
Corporate Training |
PSCAD 5.0 |
25 |
Training on Insulation Co-ordination and PSS Tuning study using PSCAD & PSSE |
Srilanka |
PSCAD Training |
YD |
YD |
Corporate Training |
PSCAD 5.0 |
26 |
Training on Power Quality using PSCAD |
Bangalore, India |
PSCAD Training |
InPhase Power Technologies Private Limited |
InPhase Power Technologies Private Limited |
Substation |
PSCAD 5.0 |
27 |
220kV GIS Data Center |
Mumbai, India |
Insulation Coordination Study |
Power Engineers |
Power Engineers |
Data center |
PSCAD 5.0 |
28 |
Garvagh 38kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Wind |
PSCAD 5.0 |
29 |
Carickallen 38kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Wind |
PSCAD 5.0 |
30 |
Magheramore 38kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Wind |
PSCAD 5.0 |
31 |
ESB & ESK 110/38kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Wind |
PSCAD 5.0 |
32 |
Frajafail – 420 / 300 / 132 kV Substation |
Ireland |
Insulation Coordination |
H&MV Engineers |
Substation Engineers |
Electric Utilities |
PSCAD 5.0 |
HOMER PRO
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
30 MW Solar Power Plant |
Senegal |
BESS Optimisation |
Avant-garde |
Avant-garde |
Microgrid and Energy Storage |
Homer Pro 3.14 |
2 |
25 MW Solar and Battery Energy System |
USA |
Homer pro 25 MW AC Solar power plant |
– |
Avant Garde |
BESS |
Homer Pro 3.14 |
3 |
25MW Solar Power Plant |
Dibibouti |
optimization of pv and battery |
Avant Garde |
Avant Garde |
Solar |
Homer Pro 3.14 |
4 |
BESS Optimization for 5 MW Solar Plant by using Homer Pro |
Chennai |
BESS Sizing |
AVANT GRADE |
AVANT GRADE |
Renewables |
Homer Pro 3.14 |
5 |
Battery Energy Storage System Rating – Power System Study – BESS and Wind Turbine Generator for Electrification of Brage Platform |
– |
– |
– |
ABB |
Offshore |
Homer Pro 3.14 |
6 |
220MW Solar Plant & BESS |
USA |
Feasible |
Avant Garde |
Avant Garde |
Renewables |
Homer Pro 3.14 PVSYST 7.2 |
7 |
1 MW Solar Power Plant |
Erulapatti, India |
Pre feasibility Study |
RK Energy |
– |
Solar |
PVSYST |
8 |
Annual Energy Yield Assessment of the Grid Connected Solar Plant |
Oman |
PV SYST |
HES |
HES |
Renewables |
PV syst |
DIGSILENT
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
275kV Transmission Network |
Malaysia |
Short Circuit Studies Relay Coordination Studies |
Uniten |
SHER Engineering |
Power |
DigSILENT 21 |
2 |
M120 – 2 MW Full Converter (Type 4) Wind Turbine Generator Product Certification |
India |
Load Flow studies Short Circuit Studies LVRT Studies |
Senvion |
Senvion |
Wind |
DigSILENT 21 |
3 |
M120 – 2 MW Full Converter (Type 4) Wind Turbine Generator Product Certification |
India |
Flicker Analysis Power Factor Requirement Studies Harmonic Analysis |
Senvion |
Senvion |
Wind |
DigSILENT 21 |
4 |
Ritaj Consultants |
Muscat Oman |
Ritaj Engineers and Consultants |
Ritaj Engineers and Consultants |
Power |
DigSILENT 21 |
|
5 |
Oman National Grid |
Oman |
ETAP to DIgSILENT Conversion |
Hesman |
Hesman |
Process Industry |
DigSILENT 21 |
6 |
33/11kV Cement plant |
Oman |
Load flow & Contingency Study Short circuit study Harmonic system study Protection coordination study Transient study Grid Islanding & Load shedding study |
– |
HES |
Manufacturing |
DigSILENT 21 |
7 |
6.5MW Solar Plant + BESS + 5.5MW Electrolyser |
– |
Load Flow, Short circuit, Transient Stability |
Replus |
Replus |
Solar |
DigSILENT 21 |
8 |
Harmonic Analysis for Solar Plant – Staveley & Basildon |
UK |
Harmonic Analysis |
Midrula |
Midrula |
Solar |
DigSILENT 21 |
9 |
132/11kV Hemel Data Center |
UK |
Load Flow, Short circuit, Relay coordination, |
Midrula |
Midrula |
Data center |
DigSILENT 21 |
10 |
LHR095H Data Center |
UK |
Load Flow, Short circuit, Relay coordination, |
Midrula |
Midrula |
Data center |
DigSILENT 21 |
11 |
SHP 33/11kV X-Ray Primary Substation |
UK |
Relay Coordination |
– |
Asa Bhanu |
Power |
DigSILENT 21 |
12 |
Hemel Data Center |
UK |
Transformer Energisation Study |
Midrula |
Midrula |
Data center |
DigSILENT 21 |
13 |
DNO Steveley solar power Plant, UK |
UK |
P28 Study |
Midrula |
Midrula |
Solar |
DigSILENT 21 |
14 |
Chandos Data center |
UK |
Load Flow, Short Circuit |
Midrula |
Midrula |
Data center |
DigSILENT 21 |
15 |
2.81MWp Solar+369kWh/738kW BESS+1.69MW Electrolyser Green Hydrogen Plant |
– |
DC Load flow Short Circuit study report Stability Study Report |
Hygenco |
Hygenco |
Solar |
DigSILENT 21 |
16 |
DNO Braintree Solar Power Plant |
UK |
Harmonic Analysis |
Midrula |
Midrula |
Solar |
DigSILENT 21 |
17 |
DNO Braintree Solar Power Plant |
UK |
P28 Study |
Midrula |
Midrula |
Solar |
DigSILENT 21 |
18 |
DNO Basildon Solar Power Plant |
UK |
P28 Study |
Midrula |
Midrula |
Solar |
DigSILENT 21 |
19 |
DNO Braintree Solar Power Plant |
UK |
G99 Study |
Midrula |
Midrula |
Solar |
DigSILENT 21 |
20 |
DNO Basildon Solar Power Plant |
UK |
G99 Study |
Midrula |
Midrula |
Solar |
DigSILENT 21 |
21 |
DNO Staveley Solar Power Plant |
UK |
G99 Study |
Midrula |
Midrula |
Solar |
DigSILENT 21 |
22 |
Training on Power System Studies using Digsilent |
India |
Digsilent Training |
Ramboll India Pvt. Ltd |
Ramboll India Pvt. Ltd |
Corporate Training |
DigSILENT 21 |
23 |
DNO Alliance Park Solar Power Plant |
UK |
G5/4 |
Midrula |
Midrula |
Solar |
DigSILENT 21 |
24 |
230 MW and 240MW Solar Plant |
Uzbekistan |
Relay Coordination |
– |
Uzasystem |
Solar |
DigSILENT 21 |
25 |
2*100MW BESS Grid booster project |
German |
PSS |
– |
Fluence |
BESS |
DigSILENT 21 |
26 |
LHR095H Data Centre |
UK |
Harmonic Analysis |
Mirdula |
Mirdula |
Data center |
DigSILENT 21 |
27 |
Training on Grid Compliance Studies for Renewables |
Online |
Transient Stability, Grid Compilance study |
Atkins |
Atkins |
Corporate Training |
DigSILENT 21 |
NA
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Mahendra CIE Bill Forge Ltd |
Bangalore |
Lighting Protection Study |
Mahendra CIE Bill Forge |
Manunath Electricals |
Manufacturing |
Excel templates Inhouse Tools |
2 |
Training on Detail Engineering |
Muscut |
DE Training |
Tracez |
OG |
Corporate Training |
Excel templates Inhouse Tools |
3 |
Secondary Design Engineering for 100MW WindPlant |
Uzbekistan |
DE |
Nukus |
Uzasystem |
Wind |
Excel templates Inhouse Tools |
4 |
ISINYA 220kV Substation |
Kenya |
Trp Matrix, InterConnection Diagram Interlock Diagram, Protection Schemes |
NCC |
Nissi Engineering |
Electric Utilities |
Excel templates Inhouse Tools |
5 |
Honda Motor Cycle & Scooters India Pvt Ltd |
India |
NGR Sizing Calculation |
Hero MotoCorp |
ModPro Engineers |
Process Industry |
Excel templates Inhouse Tools |
6 |
50 MWp in Dummakhedi Solar Power Plant ( SITARA – 30 MWp L’Volta – 20 MWp) |
Madhya Pradesh, India |
Safety Audit |
Terraform |
Substation Engineers |
Solar |
Excel templates Inhouse Tools |
7 |
300 MW Terraform Windfarm |
Maharastra, India |
Safety Audit |
Terraform |
Substation Engineers |
Wind |
Excel templates Inhouse Tools |
8 |
Terraform 100MW Solar Power Plant |
Madhya Pradesh, India |
Safety Audit |
Terraform |
Substation Engineers |
Solar |
Excel templates Inhouse Tools |
9 |
Training on Unit Protection |
Malaysia |
Unit Protection |
TUASPRING PTE LTD |
TUASPRING PTE LTD |
Power |
Excel templates Inhouse Tools |
10 |
Manpower Support for Engineering |
Singapre |
Manpower Support for Engineering |
Nexvision power & Automation |
Nexvision power & Automation |
Power |
Excel templates Inhouse Tools |
11 |
Manpower Support for Engineering |
Singapre |
Manpower Support for Engineering |
Nexvision power & Automation |
Nexvision power & Automation |
Water Treatment |
Excel templates Inhouse Tools |
12 |
Secondary Design and Layout |
Coimbatore |
Detail engineering |
Senvac |
Senvac |
Power |
Excel templates Inhouse Tools |
13 |
132 / 33 kV Substation |
Malaysia |
Unit protection |
VELLD |
VELLD |
Power |
Excel templates Inhouse Tools |
14 |
5 MW Solar Power Plant |
New York,USA |
Load flow, Short circuit, Motor Starting, Relay co-ordination, Arc flash |
MG CONSULTANT |
MG CONSULTANT |
Solar |
Excel templates Inhouse Tools |
15 |
300 MW Rabigh Solar Power Plant |
Saudi Arabia |
Review Engineering |
Saudi Electric Company |
China enegy Engineering Coorporation |
Solar |
Excel templates Inhouse Tools |
16 |
DB Engineering & Consultant GMH |
Bangalore |
Detail engineering |
DB Engineering & Consultant GMH |
DB Engineering & Consultant GMH |
Rail |
Excel templates Inhouse Tools |
17 |
DB Engineering & Consultant GMH |
Bangalore |
Detail engineering |
DB Engineering & Consultant GMH |
DB Engineering & Consultant GMH |
N/A |
Excel templates Inhouse Tools |
18 |
20 MW Solar Power Plant |
Karnataka, India |
Route Cause analysis |
ATRIA |
ATRIA |
Solar |
Excel templates Inhouse Tools |
19 |
Shree Cements |
India |
Harmonics, VFD, Motor, PLC |
Shree Cements |
Shree Cements |
Process Industry |
Excel templates Inhouse Tools |
20 |
Manpower Support for Engineering |
India |
Manpower Support for Engineering |
NORDEX |
NORDEX |
N/A |
Excel templates Inhouse Tools |
21 |
5MW Solar Power Plant |
USA |
Inverter settings |
MG Consultant |
MG Consultant |
Solar |
Excel templates Inhouse Tools |
22 |
Serbia Detail design- Traction Power |
Serbia |
Traction power detail design |
DB |
DB |
Rail |
Excel templates Inhouse Tools |
23 |
Feasibility Study for Back up power for DGS N |
Iraq |
Engineering services |
ZPOD |
KSS energy consultants / ARD |
Oil & Gas |
Excel templates Inhouse Tools |
24 |
Solar Plant Engineering Review |
USA |
Review Engineering |
Keentel |
Keentel |
Solar |
Excel templates Inhouse Tools |
25 |
Doosan Bobcat Private Ltd |
Chennai |
DG upgrade Feasiblity and HT cable routing |
Doosan Bobcat |
Power Projects |
Oil & Gas |
Excel templates Inhouse Tools |
26 |
12 MW RDF Based WtE Power Plant |
Delhi, India |
Harmonic measrement RCA |
Indoenviro |
Indoenviro |
Manufacturing |
Excel templates Inhouse Tools |
27 |
Bill Forge Unit 3 |
Bangalore |
Arc flash Label Supply |
Mahindra CIE Automotive Limited |
Mahindra CIE Automotive Limited |
Manufacturing |
Excel templates Inhouse Tools |
28 |
230MW NTPC CPSU Solar Plant |
Tuticorin |
Harmonic Measurement |
NTPC |
L&T |
Solar |
Excel templates Inhouse Tools |
29 |
Training on Grid Compliance Studies using PSCAD and PSSE |
India |
Training on PSSe & PSCAD |
NTPC |
NTPC |
Corporate Training |
Excel templates Inhouse Tools |
30 |
Apraava Dedasari 250MW Soar Power Plant |
India |
Transformer OLTC Failure |
– |
Param renewables |
Solar |
Excel templates Inhouse Tools |
31 |
Shoaiba-Quaiza B Water Transmission System |
Jeddah,Saudi |
Detailed Engineering |
Water Transmission and Technologies Co. |
SASEC Engineering |
Water |
Excel templates Inhouse Tools |
32 |
33 kV Switchgear |
UAE |
CT Sizing Low Impedance Busbar Differential Protection |
ACUME |
ACUME |
Manufacturing |
Excel templates Inhouse Tools |
33 |
220/35kV 100MW Nukus Wind Power Plant |
Uzbekistan |
CT/VT Calculation |
Uzassystem |
Uzassystem |
Wind |
Excel templates Inhouse Tools |
34 |
30MW Braintree, Staveley, Basildon Solar Plant |
UK |
Lightning Risk Assesment |
Midrula |
Midrula |
Solar |
Excel templates Inhouse Tools |
35 |
Training on substation Design Engineering |
Oman |
Detailed Engineering Training |
DEC |
DEC |
Process |
Excel templates Inhouse Tools |
36 |
Training on Detail Engineering |
Hyderabad, India |
DE Training |
Amararaja |
Amararaja |
Substation |
Excel templates Inhouse Tools |
37 |
Amazon Web Service |
Bahrain |
Earthing |
H&MV Engineers |
Substation Engineers |
Process Industry |
Excel templates Inhouse Tools |
DAILUX
Sl.No |
Project |
Location |
Scope |
End Customer |
Client |
Sector |
Software |
1 |
Wells Lighting |
Iraq |
Lighting Design |
ZPOD |
KSS energy consultants |
Manufacturing |
Dialux |